My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2000-05-22 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2000
>
2000-05-22 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:13 PM
Creation date
7/31/2025 10:55:15 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
5/22/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />REQUEST:& CITY COUNCIL AGENDA ITE~ <br /> <br />Agenda Date Reqnested: ~o <br /> <br />Requested By: S. Gill~~epartment: Public Works <br /> <br />_ Report _ Resolution XX Ordinance <br /> <br />Exhibits: <br /> <br />Ordinance No. 00- <br />Engineer's Recommendation and Bid Tabulation <br /> <br />SUMMARY & RECOMMENDATION <br /> <br />The FY 1999-2000 Utility CIP Fund includes two (2) waterline replacement projects that were designed and bid <br />as one project - Catlett Lane and Park Drive Waterline Replacement Project. The Project, designed by Claunch <br />& Miller, Inc., received bids on May 8, 2000, with four bids received. Low bid was submitted by Triple B <br />Services, Inc. in the amount of $217,460.00. Completion date is 90 days after receipt of notice to proceed. A <br />total of $300,000.00 was budgeted for this Project. <br /> <br />As illustrated by the attached bid tabulation, the bids ranged from a high of $364,187.31 to the low bid. Low <br />bid was checked by the Engineer for past work experience, safety experience and references. Tripple B <br />Construction Services was the contractor for the 1999 Water Replacement Project. Additionally, the Engineer <br />analyzed the bids to determine if low bid was unbalanced. Work experience, safety experience and references <br />checked out, and line item bids were well balanced. <br /> <br />A total of $257,230 is available for this Project. It is recommended that a contract be awarded to Triple B <br />Services, Inc. in the amount of $217,460.00. A contingency of $10,000.00 is also recommended. <br /> <br />Action Required by Council: Approve Ordinance No. 00- authorizing the City Manager to execute a <br />contract with Triple B Services, Inc. in the amount of $217,460.00 for the construction of the Project. <br />Additionally, authorize $10,000.00 for contingency. <br /> <br />Availability of Funds: <br /> <br />General Fund_ WaterlWastewater <br />...x Capital Improvement <br />Other <br /> <br />Account Number: 003-9890-817-5110 Funds Available: X YES NO <br /> <br />Approved for Citv Council Ae:enda <br /> <br />~~ T. ~~ <br />Robert T. Herrera Date <br />City Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.