My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2000-05-22 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2000
>
2000-05-22 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:13 PM
Creation date
7/31/2025 10:55:15 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
5/22/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />.-" <br />I <br /> <br />EJCDC <br />STANDARD FORM OF AGREEMENT <br />BETWEEN OWNER AND CONTRACTOR <br />ON THE BASIS OF A STIPULATED PRICE <br /> <br />THIS AGREEMENT is by and between <br />(hereinafter called OWNER.) and <br /> <br />Citv of Ea Porte <br /> <br />Trirlp R ~~rv;~~~, Tn~_ <br /> <br />(hereinafter called CONTRACTOR). <br /> <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: <br /> <br />ARTICLE 1 - WORK <br /> <br />1.01 CONTRACfOR shall complete all Work as specified or indicated in the Contract Documents. The Work is generally <br />described as follows: <br /> <br />Catlett Lane and Park Drive Waterline Replacement Project <br /> <br />. ; <br /> <br />ARTICLE 2 - THE PROJECT <br /> <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is generally described <br />as follows: <br /> <br />Catlett Lane and Park Drive Waterline Replacement Project <br /> <br />ARTICLE 3 - ENGINEER <br /> <br />3.01 The Project bas been designed by <br /> <br />Claunch & Miller, Inc. <br /> <br />who is hereinafter called ENGINEER and who is to act as OWNER's representative, assume all duties and responsibilities, <br />and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with the completion of the <br />Work in accordance with the Contract Documents. <br /> <br />00500-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.