My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2000-05-22 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2000
>
2000-05-22 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:13 PM
Creation date
7/31/2025 10:55:15 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
5/22/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />REOUES'FOR CITY COUNCIL AGEA ITEM <br /> <br />Agenda Date Requested: May 22, 2000 <br />Requested By: Doug Kneupper <br /> <br />Department: Planning <br /> <br />Report <br /> <br />Resolution <br /> <br />x <br /> <br />Ordinance <br /> <br />Exhibits: Ordinance <br /> <br />Bid Tabulation <br /> <br />Bidder's List <br /> <br />Summary & Recommendation <br />During the final design phase of the new Community Library building, The Planning <br />Department determined that the sanitary sewer connection was required to be lower than the <br />nearest connecting location we had available, therefore, an extension for the sanitary sewer <br />line was needed in order to achieve the required depth. The La Porte Community Library <br />Sanitary Sewer Project consists of installing approximately 1,070 lineal feet of 8 Inch sanitary <br />sewer pipe to provide service to the new proposed Community Library Building.. <br /> <br />Survey, design and engineering were performed on this project utilizing City Staff. On May <br />15, 2000, the City received competitive bids from six qualified contractors (see attached Bid <br />Tabulation). Slack & Co. Contracting, Inc. of Houston, Texas submitted the low bid in the <br />amount of $35,592. Contract will be complete within 30 consecutive calendar days once <br />"Notice to Proceed" is issued. <br /> <br />Staff has reviewed the bids submitted and determined the low bid from Slack & Co. <br />Contracting, Inc. is within the budgeted amount and Slack & Co. Contracting, Inc. is <br />qualified to perform this work. Staff recommends that the City Council authorize the City <br />Manager to execute a contract with Slack & Co. Contracting, Inc. in the amount of <br />$35,592.00 and further authorizing $1,800.00 (5%) contingency for construction of the La <br />Porte Community Library Sanitary Sewer. Sufficient funds are available from the Utility <br />Capital Improvement Developer Oversizing/Participation program to fund this project. <br /> <br />Action Required by Council: <br />Consider approving an ordinance authorizing the City Manager to execute a contract with <br />Slack & Co. Contracting, Inc. in the amount of $35,592.00 and further authorizing $1,800.00 <br />contingency for construction of the La Porte Community Library Sanitary Sewer. <br /> <br />Availability of Funds: <br />General Fund <br />X Capital Improvement <br />Other <br /> <br />Water /W astewater <br />General Revenue Sharing <br /> <br />Account Number: <br /> <br />003-9890-725-1100 <br /> <br />Funds Available: X Yes <br /> <br />No <br /> <br />Approved for City Council Agenda <br /> <br />G(~TI ~~ <br /> <br />Robert T. Herrera <br />City Manager <br /> <br />!i- \~- OD <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.