My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2000-06-12 Regular Meeting and Special Called Workshop Meeting
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2000
>
2000-06-12 Regular Meeting and Special Called Workshop Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:13 PM
Creation date
7/31/2025 10:55:18 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
6/12/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• • <br />REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Agenda Date Requested: June 12, 2000 <br />Requested By: Doug Kneuppe Department: Planning <br />Report Resolution <br />X Ordinance <br />Exhibits: Ordinance Bid Tabulation Bidder's List <br />Summary & Recommendation <br />As part of the FY 1999-2000 Budget for Utility Capital Improvement Projects, City Council <br />approved $20,000.00 for Ground Storage Tank Repairs. The Ground Storage Tank Repairs <br />project consists of sandblasting, minor pit repairs and application of NSF approved 3-coat <br />epoxy paint system to the interior floor of three galvanized bolted steel water storage tanks. <br />(Tank #1 on Fairmont Park, Tank #2 on 4`h Street, and Tank #3 on Bandridge Street) <br />Design and engineering were performed on this project utilizing City Staff. On May 15, 2000, <br />the City received competitive bids from three qualified contractors (see attached Bid <br />Tabulation). Gulf States Protective Coatings, Inc. of Kemah, Texas submitted the low bid in <br />the amount of $27,000.00. Contract will be complete within 105 working days once "Notice <br />to Proceed'° is issued. <br />Staff has reviewed the bids submitted and determined the low bid from Gulf States Protective <br />Coatings, Inc. is within the budgeted amount and Gulf States Protective Coatings, Inc. is <br />qualified to perform this work. Staff recommends that the City Council authorize the City <br />Manager to execute a contract with Gulf States Protective Coatings, Inc. in the amount of <br />$27,000.00 and further authorizing $1,350.00 (5%) contingency for the Ground Storage Tank <br />Repairs. The extra funds ($8,350.00) can be obtained from account 003-9890-816 (Catlett <br />Waterline Replacement) surplus. <br />Action Required by Council: <br />Consider approving an ordinance authorizing the City Manager to execute a contract with <br />Gulf States Protective Coatings, Inc. in the amount of $27,000.00 and further authorizing <br />$1,350.00 contingency for the Ground Storage Tank Repairs. In addition, authorize the use of <br />excess funds from the Waterline Replacement Project. <br />Availability of Funds: <br />General Fund Water/Wastewater <br />X Capital Improvement General Revenue Sharing <br />Other <br />003-9890-816 <br />Account Number: 003-9890-817 <br />Funds Available: X Yes No <br />Approved for City Council Agenda <br />~~ T. I1~.~-~,....~ c~-c~ -~a <br />Robert T. Herrera Date <br />City Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.