Laserfiche WebLink
<br />REQt.AT FOR CITY COUNCIL AGA>A ITEM <br /> <br />Appropriation <br /> <br />Agenda Date Requested: February <br /> <br />Requested By: Doug Kneuppe <br /> <br /> <br />Source of Funds: Fund 041 <br /> <br />Account Number: 041-9892-832-1100 <br /> <br />Department: Planning <br /> <br />Amount Budgeted: $830,000 <br /> <br />Report: _Resolution: _Ordinance:--X- <br /> <br />Amount Requested: $761,000 <br /> <br />Exhibits: Ordinance, Change Order #1 <br />Letter of Recommendation and <br />Bid Tabulation from Randall-Porterfield <br />PIC-Qualified Bidder List <br /> <br />Budgeted Item: YES <br /> <br />. <br /> <br />Summary and Recommendation <br /> <br />The FY 01-02 Budget provides $830,000 for design and construction of Fire Station #4. The January <br />1999 Bond Election provided $750,000 and the current budget added $80,000. Subtracting existing <br />funding commitments for architectuml and other design related services leaves approximately $761,000 <br />available for construction. The new station is a little over 7,000 s.f., and will be 3 bays wide with dorm <br />areas for the full-time firefighters. The station will be located at the comer of S. Broadway and McCabe <br />Road. <br /> <br />Construction plans were prepared by the architectural firm Randall-Porterfield. City staff pnqualified 13 <br />general contractors before the bidding process was initiated. The project was advertised and bids were <br />opened on January 14, 2002 (see attached bid tabulation). The low bidder is Construction Masters, Inc. <br />with a base bid amount of $720,000.00 and $32,300 for the emergency generator. The generator should, <br />if possible, be included with this project. The bid amount for the generator is clearly high, so the architect <br />and staff have negotiated with Construction Masters to reduce the generator amount to $20,000. (The <br />average of all generator bids is $18,079). Additionally, in an attempt to keep bid amounts within budget, <br />the architect specified a medium-gmde metal roof that has a 10-12 year lifecycle before some leaking <br />would occur and replacement or repair of the roof would be necessary. Since there are funds available, <br />the architect recommends installing an upgraded metal roofing system with a 30-plus year life-cycle. <br />Construction Masters has indicated the upgraded roofing system will cost an additional $14,000. The <br />architect has verified that this amount is legitimate and fair. <br /> <br />The architect has verified the bid submitted by Construction Masters is responsive to the plans and <br />specifications. Staff recommends awarding this contract to Construction Masters for $720,000 plus <br />executing Change Order #1 for $34,000 ($20,000 fir generator, $14,000 for roof), and provide the <br />balance of the funds available, $7,000, as contingency. <br /> <br />Action Required by Council: <br /> <br />Consider, 1) approving an ordinance authorizing the City Manager to execute a construction contmct with <br />Construction Masters, Inc. for construction of Fire Station # 4 in the amount of $720,000, 2) authorizing <br />the City Manager to execute Change Order #1 in the amount of $34,000, and 3) providing $7,000 for <br />contingency for a total appropriation of$761,000 to fund said contract. <br /> <br />Approved for City Council A2enda <br /> <br />CK~ \, ~~ <br /> <br />Robert T. Herrera, City Manager <br /> <br />2- - S "O'-U <br />Date <br />