My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2002-06-10 Regular Meeting, Public Hearing, and Workshop Meeting
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2002
>
2002-06-10 Regular Meeting, Public Hearing, and Workshop Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:17 PM
Creation date
7/31/2025 10:58:48 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
6/10/2002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />5.2 Buffering and Beautification. The Owner-Developer shall implement a uniform <br />and/or compatible landscape plan for all phases of the entire project that will address <br />landscaping provisions not only adjacent to Wharton Weems Blvd. and Powell Road, <br />but also within the building setbacks and landscape easements or reserves throughout. <br />A Landscape Buffer (1 DO-feet wide) shall be provided along the west side of Powell <br />Road and shall include extensive screening-type vegetation with grassed berms within <br />the existing pipeline easement. A landscape buffer, 50' wide, will also be provided <br />along State Highway 146. Landscape reserves shall also be included adiacent to all <br />roadways, including the east side of Powell; but rather than screen, shall be <br />landscaping compatible with the ultimate use of that adjacent property. <br /> <br />5.3 Signage. The Owner-Developer shall implement a sign standards policy, as <br />part of the Declaration of Restrictive Covenants (Exhibit "E") consistent with the City's <br />Code of Ordinances as guidance to insure effective and uniform signage is employed <br />throughout the project. This policy will include uniform and/or compatible project <br />identification monuments, business signage, street and other traffic directional devices <br />conforming to the Tract's traffic control plan and deed restrictions. <br /> <br />5.4 Ownership and Maintenance. Ownership of the landscape buffers, reserves <br />and easements will be held by fee ownership of adjoining property or by the Property <br />Owners Association (POA), subject to conditions of the deed restrictions and landscape <br />plan. The maintenance of the buffers, reserves and easements will be the <br />responsibility of the contiguous property owners pursuant to provisions of the deed <br />restrictions, enforced by the POA. <br /> <br />The Open Space/Pedestrian Trail System shall be constructed within or adjacent to the <br />drainage easement and detention pond/drainage system as dictated by the final <br />detention design. Ownership and maintenance of the Open Space/Pedestrian Trail <br />System and drainage/detention pond system shall be determined according to Article <br />5.1 of this Agreement. <br /> <br />ARTICLE VI. SCHEDULE <br /> <br />6.1 Schedule. The Owner-Developer shall establish a specific schedule for the <br />development of and construction improvements on the Tract with the end user(s). <br />However, in lieu of and as the basis of that detailed schedule, the following work <br />program is anticipated: <br /> <br />. Initiation of complete engineering study, including drainage and preliminary <br />infrastructure design. <br />. Detailed engineering design for Phase One, being all or substantial part of area <br />identified herein as Section One. This would include rail connection to main line <br />and a minimum spur connection to first building anticipated, water and sanitary <br />sewer service initial drainage and detention to accommodate Phase One; <br />. Construction of Wharton Weems Blvd. and Powell Road shall be completed within <br />12 months of Phase One completion; <br /> <br />TIEP 2002 Development Aareement-Final.doc <br /> <br />Paae 4 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.