Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />Apda-~:::;~~ <br />Requested By: Ril"hllm__ ~-- <br />Department: P9Ur~ <br /> <br />ADDI'ODriation <br /> <br />Source of Funds: Police Department <br />Budget <br />Account Number: 00151525218002 <br /> <br />Report: <br />Exhibits: <br /> <br />Resolution: <br /> <br />Ordinance: <br /> <br />Amount Budgeted: <br /> <br />Bid Tabulation <br /> <br />Amount Requested: ~1c,cm on <br /> <br />Exhibits: <br /> <br />Bidden List <br /> <br />Budgeted Item: YES NO <br /> <br />Exhibits: <br /> <br />SUMMARY & RECOMMENDATION <br /> <br />Technology Serving People, Inc. (fSP) conducted an indoor air quality evaluation of the City of La Porte Police, <br />Municipal Court and the Neighborhood Center building on September 4, 2002. Although mold levels at the time of <br />the evaluation met guidelines for occupancy, it was recommended by TSP that the areas effective needed to be <br />removed and replaced. TSP came back on January 24, 2003 and pedbrmed an asbestos survey on all three adjoining <br />buildings. The inspection and material sampling were conducted following the requirements of the Texas Asbestos <br />Health Protection Rules. No asbestos was identified in the Municipal Court, however materials were found to <br />contain asbestos (>1%) in both the Police Department and the Neighborhood Center. TSP prepared a Mold <br />Abatement Scope of Work and Cost Estimates and recommended the City take bids for this work. TSP <br />recommended the contractor shall be responsible for removal of asbestos contaminated materials, mold abatement, <br />cleaning and replacing wallboard, painting and any other repairs necessary. TSP estimated a total cost of $7,400 and <br />$1000 for contingency to cover further water and mold damage inside walls that could not be identified during the <br />inspections. <br /> <br />Mold Abatemerit bids were opened and read on April 14, 2003. Bid requests were mailed to 5 vendors with 4 <br />retumiilg bids. Of the four vendors submitting bids, GBS Environmental was the low bidder for the mold abatement <br />at $7,060.00. The State of Texas Asbestos Rules requires a Licensed Asbestos Project Manager be on site during all <br />asbestos abatement activities. It is recommended TSP provide this service, since they are already familiar with the <br />effective sites. Project Management Consultant Fees will be $750.00 a day. GBS has estimated 10 days for <br />completion of this ptoject, which will come to. $7,500 for co~taDt fees. The total cost of this project will be <br />$15,560.00, which includes the recommended $1000 for contingency. Funds for this Mold Abatement project were <br />not budgeted however will come out of the FY 03 Police Department Budget. <br /> <br />Action Reauired bv Council: <br />Consider and approve the awarding bid for mold abatement of the Police, Municipal Court and <br />Neighborhood Center building to GBS Environmental and also approve the Consultant fees be <br />provided by Technology Serving People. <br /> <br /> <br />~~~-o3 <br />Date <br />