Laserfiche WebLink
ii • <br />HARRIS COUNTY <br />DEPARTMENT OF PUBLIC INFRASTRUCTURE 1001 Preston Avenue <br />ENIGINEERINO DIVISION Seventh Floor <br />Houston, Texas 77002 <br />(713)755-5370 <br />10 December 2003 <br />COST SUMMARY <br />Construction $229,851.50 <br />10% Contingency $ 22,985.15 <br />Engineering Services $ 91,000.00 <br />Total Project Cost $343,836.65 approx. $344,000 <br />City of La Porte Share (50%) is $172,000 <br />N <br />hAword\pct2\12-10-03.003.doc <br />