Laserfiche WebLink
<br />City of La Porte <br />Public Work's Metal Building <br /> <br />with the General and Special Conditions of Agreement, plans and other drawings and printed or written explanatory <br /> <br />matter thereof, and the Specifications and addenda therefor, as prepared by Claunch & Miller, Inc., hereinafter <br /> <br />called "ENGINEER", each of which has been identified by the CONTRACTOR and the ENGINEER, together with <br /> <br />CONTRACTOR'S written Proposal, the General Conditions of Agreement and the Performance and Payment <br /> <br />Bonds hereto attached, all of which are made a part hereof and collectively evidence and constitute the entire <br /> <br />Contract. <br /> <br />The CONTRACTOR hereby agrees to commence work within ten (10) days after the date <br /> <br />written notice to do so shall have been given to it and to substantially complete the same within the time specified <br /> <br />in the contract documents, subject to such extensions of time as shall be specified in the General and Special <br /> <br />Conditions or shall have been specifically agreed to in writing by the parties hereto, which writing shall be attached <br /> <br />to this Contract as a part hereof. <br /> <br />The OWNER agrees to pay the CONTRACTOR in current funds for the performance of the <br /> <br />Contract in accordance with the Proposal submitted therefor, which forms a part of this Contract, subject to <br /> <br />additions and deductions as provided in the contract documents, and to make payment on account thereof as <br /> <br />provided therein. <br /> <br />eM! JOB NO. 03-093 <br /> <br />AGREEMENT -2 <br />