My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2004-05-10 Regular Meeting and Workshop Meeting
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2004
>
2004-05-10 Regular Meeting and Workshop Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:19 PM
Creation date
7/31/2025 11:01:57 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
5/10/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-e <br /> <br />.. <br /> <br />SCOPE OF WORK <br /> <br />Contractor shall provide equipment, materials, and workmanship to remove existing <br />vegetati.on, 'prepare a solid sand base. and shall construct. a new ten fo~t (10') w!de <br />concrete' pathway app"roximately 1,040 linear feet on the "M" Street right" of way' from the <br />rear of the La Porte Recreation & Fitness Center westward to. the "3rd" Street right of <br />way, then southward to the Pede~trian bridge over Little Cedar Bayou, aGcording to the' <br />attached specifications. SpeCifiC siting of the project will be staked by. Owner, prior to <br />commencement of wor~. All existing materials (grass, humus, asphalt, 'crushed granite <br />or other material) that the contractor will remove to cons~ruct concrete. pathway will <br />become the property of the contractor and disposal of the materials will be p~rt of the <br />submitted bid .for' contract. Contractor will have (45) forty- five days to complete proje~t <br />after the bid is awarded. . . <br /> <br />Concrete Pathway: Contractor shall remove existing asphalt and crushed <br />granite pathways and construct.approximately 1,040 linear feet of concrete pathway. <br />The pathway will be 10' width X 4" depth. Pathway will be constructed in place <br />according to area site plan and according to bid specifications. <br /> <br />Cleanup: Contractor shall remove all debris, excess and leftover materials, <br />equipment, .waste concrete, forms, from the site and shall leave it in good condition as <br />determined by Owner representative. <br /> <br />. Payment:. With the absence of.a Performance Bond, City will make o~ly one <br />(1) payment to the Contractor upon the full.and fi~~1 completion of all work items. <br /> <br />Page 3 of 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.