<br />,e <br /> <br />e <br /> <br />SUPPLEMENTARY CONDITIONS OF THE AGREEMENT <br /> <br />SC-1 PRECEDE'NCE: These supplementary conditions of the Agreement are. a <br />supplement and where in conflict, they take precedence over the General Conditions of <br />the Agreement of this Spe~ification. <br /> <br />SC-2 OWNER/ENGINEER: The word "OWNER". in these Specifications shall be <br />understood .as referring to the City of La Porte, Texas. The word "ENGINEER" in these <br />. Specifications shall be understood as referring to the City Engineer for the City of La Porte, <br />Texas. . <br /> <br />SC-3 SCOPE OF WORK: The work to be performed under this contract consists of <br />furnishing' all materials, labor, supervision, tools.. and equipment necessary to complete the <br />. work. <br /> <br />SC-4 SEQUENCE OF WORK: All work covered by this Contract Shall be .completed <br />within the number of calendar days designated by the Contractor in the Bid Proposal. <br /> <br />SC-5 TIME OF COMPLETION: The CONTRACrOR shall complete the work as provided <br />in the Contr~ct Documents and within the time limitations described in .paragraph SC4, <br />Sequence of Work, unless otherwise stipulated to proceed. Calendar days shall be <br />computed beginning and inclusive of the first day of the Notice to Proceed. <br />CONTRACTORS shall .notify OWNER in writing 48 hours prior to start of .construction. <br />The time of completion shall include delivery time of all equipment and materials required <br />to complete the work in conformance with the Drawings and Specif!cations. <br /> <br />SC-6 LIQUIDATED DAMAGES FOR DELAY: It is understood and agreed between the <br />parties hereto that time is of the essence of this Contract, . and that for each calendar day <br />of delay beyond the completion date (after due allowance for such extension of time as <br />provided herein) the CONTRACTOR shall pay the OWNE~ as liquidated damages the. <br />sum of one hundred dollars ($100.00), it being understood between the parties hereto that <br />su~h sum shall be treated not as a penalty, but a~ liquidated damages for lo'ss of revenue <br />to the OWNER. . <br /> <br />SC-7 GUARANTEE: The CONTRACTOR shall furnish the OWNER with a written <br />guarantee 'on all workmanship and materials provided by hi':Tl for the project. The written <br />guarantee shall be made out to the OWNER and in a form satisfactory to the OWNER, <br />guaranteeing all of the work under the -Contract to be free from faulty materials in every <br />particular, and free from faulty workmanship, and ag~inst injury from proper and usual <br />wear; and agreeing to replace or to re-execute without cost to the OWNER such work as . <br />may be .found to be imperfect or improper, and to make good all damage caused to other <br />required replacement or re-execution. Thegl,1arantee shall be made to cover a period of <br />one.year from the date of completion of all work under this Contract. This guarantee must <br />be furnished to the OWNER for approval, prior to acceptance and final. payment. Neither <br />the final certificate nor payment nor any provision in the Contract Documents shall relieve <br />the CONTRACTOR of the responsibility for neglect or faulty materials or workmanship <br />during' the period covered by the gu'arantee. <br /> <br />Page 18 of 36 <br />