My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2004-11-08 Regular Meeting, Public Hearing and Workshop Meeting
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2004
>
2004-11-08 Regular Meeting, Public Hearing and Workshop Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:20 PM
Creation date
7/31/2025 11:02:37 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
11/8/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
360
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />J'.,6 <br /> <br />DATE: November 12, 2004 <br />PROJECT NAME: Fire Station NO.2 <br />City of La Porte, Texas <br />CLP Project No. 99-2206 <br />CLP Bid No. 04039 <br />PROJECT NO.: 328-1 <br />TO: Pre-qualified Bidders <br /> <br /> <br />DANSBY & MILLER ARCHITECTS <br />102 E Edgebrook <br />Houston, Texas 77034 <br /> <br />DOCUMENT 00900 <br />ADDENDUM NO.3 <br /> <br />This Addendum forms a part of the Contract Documents and modifies the original Bidding <br />Documents as noted below. Acknowledge receipt of this Addendum in the space provided on <br />the Bid Form. Failure to do so may subject Bidder to disqualification. <br /> <br />This Addendum consists of 3 pages and attachments as follows: <br />. SECTION 09910 PAINTING, pages 00910-5 thru 00910-8 <br />· DRAWINGS ADD 3.1, ADD 3.2 and ADD 3.3 <br /> <br />PART ONE - MODIFICATIONS TO PRIOR ADDENDA: Not Used <br /> <br />PART TWO - MODIFICATIONS TO BIDDING REQUIREMENTS: Not Used <br /> <br />PART THREE - MODIFICATIONS TO SPECIFICATIONS: <br />3.1 SECTION 05500 METAL FABRICATIONS, add paragraph 2.1.D.8 Ornamental Gates <br />(Bid Alternates 2 and 3): <br />a. Double and single swing gates, size and detail as indicated in the Drawings. <br />b. Fabricate from structural steel tubing per ASTM A500, welded joints ground smooth; <br />hot- dip galvanize gate assembly after fabrication in accordance with ASTM A 123. <br />c. Hardware shall be fabricated components to include hinges, drop bolts, sleeves for <br />drop bolts, lever handle passage set, lock box, and hasp for owner furnished <br />padlock. <br />1) 1 % pair, 7 inch barrel hinges per gate leaf with lubricant fittings <br />2) Schlage or equivalent lever passage set, 630 finish at Patio Court Yard. <br />d. Louver infill: Ruskin Thinline ELF15J, 1 % inch frame depth, extruded aluminum with <br />shop applied primer for powder coat finish. <br />e. Finish: Phosphate treatment followed by baked on polyester powder coat, minimum <br />. 2.5 mils cured film thickness, ASTM D3363 pencil hardness. <br />3.2 SECTION 09910 PAINTING, replace Pages 09910-5, 6, 7and 8 with revised pages <br />issued with this addendum. <br />3.3 SECTION 10810 TOILET ROOM ACCESSORIES <br />A. Paragraph 3.4.D, change to: Combination Paper Towel Dispenser and Waste <br />Receptacle, Bobrick B-43944, semi-recessed with reusable heavy gauge vinyl liner. <br />Provide 1 each at Toilet Rooms 104, 105, 114 and 115. <br /> <br />Proj. No. 328-1 <br /> <br />00900-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.