Laserfiche WebLink
<br />REQUEST FOR CITY COUNCIL AGENDA ITEM <br /> <br />Appropriation <br /> <br />Requested By: <br /> <br /> <br />Source of Funds: NA <br /> <br />Agenda Date Requested: <br /> <br />Account Number: NA <br /> <br />Department: <br /> <br />Planninl! <br /> <br />Amount Budgeted: NA <br /> <br />Report: -X-Resolution: _Ordinance: <br /> <br />Exhibits: <br />General Plan--Lakes at Fairmont Greens <br /> <br />SUMMARY <br /> <br />In coordination with Arete Development and Brown & Gay Engineering, City Staff is exploring several <br />options that impact upon the development and General Plan for the Lakes at Fairmont Greens (Golf <br />Course Development). The primary focus at this point is the design and function of the various detention <br />areas (Lakes) that will serve as both an amenity for the development and detention for the Subdivision as <br />well as the City's Golf Course. <br /> <br />The primary intent is to design the Lakes in such a way as to provide: <br /> <br />. the required drainage improvements <br /> <br />. ease of maintenance <br /> <br />. the appearance and design of "Lakes" to enhance the future trail system and <br /> <br />. aspects to assist in the drainage of areas of the Golf Course that are currently problematic. <br /> <br />In order to accomplish this, Staff and the Developer's Engineers conducted an on-site survey of the areas <br />shared by the Subdivision and the Golf Course. The attached Exhibit shows areas that may be used to <br />both "round-off" various corners of the Lakes and improve drainage within the Golf Course. To initiate <br />this concept, a small portion of unused areas of the Golf Course would be excavated and graded to <br />augment the Lakes of the Subdivision and additional piping and grading would be used to drain other <br />areas, totally within the Golf Course, to the Lakes. While property lines would be unchanged, the <br />resulting Lakes would revert to Public use upon completion. Each entity, Developer and City, would <br />retain responsibility for the maintenance of drainage improvements within their respective boundaries. <br />Staff views this opportunity as being a mutual benefit to both the development and the City. <br /> <br />Action Required bv Council: <br /> <br />Direct Staff to continue coordination and development of the outlined drainage augmentation <br />incorporating City property in a joint venture. <br /> <br /> <br />s --(j:3 -D5 <br /> <br />Date <br />