My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2006-03-27 Regular Meeting and Workshop Meeting
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2006
>
2006-03-27 Regular Meeting and Workshop Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:21 PM
Creation date
7/31/2025 11:04:48 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
3/27/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />REQUEST FOR CITY COUNCIL AGENDA ITEM <br /> <br />Appropriation <br /> <br />Department: <br /> <br /> <br />Source of Funds: NA <br /> <br />Agenda Date Requested: <br /> <br />Requested By: <br /> <br />Account Number: NA <br /> <br />Amount Budgeted: NA <br /> <br />Report: _Resolution: _Ordinance: <br /> <br />Exhibits: F216 Project Layout <br />Pond &Trail Concept <br /> <br />SUMMARY <br /> <br />The target area for the F216 Drainage Project is outlined at enclosure 1. During a progress review with <br />the consultant for the design of the F216 drainage project, permitting issues resulted in a brainstorming <br />session on how to redesign the system to accommodate requirements for both the Army Corps of <br />Engineers (ACOE) and the Texas Commission for Environmental Quality (TCEQ) who have limited <br />jurisdictional issues on the F216 channel. <br /> <br />This meeting resulted in a modification of the original concept of design by enlarging the Southern <br />portion of the detention area where more volume could be gained and allowing less ditch work along the <br />Northern portion ofthe system. The end result would be a water feature with trails in the South and more <br />of a formal park feature in the Northern part of the project while maintaining or increasing water storage <br />potentiaL This design also lends itself to phasing should construction dollars be an issue. A concept <br />drawing of a similar project is attached for your review at enclosure 2. <br /> <br />The redefined concept was coordinated with the Director of Parks and Recreation who favors the <br />modified concept. The consultant is running a new design program to set the parameters and cost of the <br />modifications. The new criteria should be received by April 14, 2006. <br /> <br />Action Required bv Council: <br />Review the attached concept and provide Staff with direction. <br /> <br />Approved for City Council Al!enda <br /> <br /> <br />7r6 <br />I <br /> <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.