My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2006-06-12 Regular Meeting, Public Hearing and Workshop Meeting of the La Porte City Council (2)
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2006
>
2006-06-12 Regular Meeting, Public Hearing and Workshop Meeting of the La Porte City Council (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:21 PM
Creation date
7/31/2025 11:05:20 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
6/12/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />REQUEST FOR CITY COUNCIL AGENDA ITEM <br /> <br />Agenda Date Requested: June 26, 2006 <br /> <br />Appropriation <br /> <br />Requested By: Wayne J. Sabo <br /> <br />Source of Funds: <br /> <br />CDBG <br /> <br />Department: Planninl! <br /> <br />Account Number: <br /> <br />Grant Fund 032 <br /> <br />Report: X Resolution: _Ordinance: ~ 0 <br /> <br />Exhibits: Bid Tab Project #06012 (N. 2nd Street) <br /> <br />~;JM~Co. <br /> <br />Amount Budgeted: <br /> <br />$95,910 <br /> <br />~~ <br />------- <br /> <br />Amount Requested: <br /> <br />Budgeted Item: <br /> <br />$132,936.33 <br />YES <br /> <br />SUMMARY & RECOMMENDATION <br /> <br />Harris County Community & Economic Development Department previously awarded the City a CDBG grant to extend and pave <br />North 2nd Street to the E Street ROW, The original grant proposal was to extend 2nd Street and utilities. The amount awarded <br />was $56,475,00 with $55.910.25 for construction. The scope that came back with the contract was only for paving, The contract <br />also did not allow the use of in-house assets to pave the street. The City notified Harris County that the project was short funds to <br />complete the project. On March 27, 2006, City Council amended the budget to accept an additional Harris County award of <br />$40,000 bringing the total construction funding to $95,910, <br /> <br />Since awarding the grant, Harris County has changed project officers twice, Although not stated in the scope, the new County <br />project officer stated thatthe extension of the water line with the paving was allowable, As part of the City's leveraging funds, <br />the City has cleared and grubbed the North 2nd Street ROW, surveyed the project area and the Engineer Division designed and bid <br />the project. Given the additional funding, the project was designed with the water line extension included, There were no bidders <br />on the first publication. Harris County instructed the City to re-bid, <br /> <br />On the second bidding period, the City received 2 bids with low bid of$132,936.33 from TEXCOR: <br /> <br />. Paving $92,332.0 I <br />. Drainage $ 8,769,99 <br />. Waterline $21,834,33 <br />. Contingencies $ I 0,000.00 <br /> <br />Value engineering was considered by substituting the lime stabilized sub-grade with low plasticity select fill as well using <br />calcium sulfate instead of cement is a binder in the flexible base. These prospective changes resulted in a net decrease in the cost <br />of the project by $2,506,81, Accepting the substitutions, however, would increase maintenance costs over the lifespan of the <br />street so the substitutions were rejected. <br /> <br />Harris County has indicated that the CDBG fund award can be altered to allocate the City an additional $37,053.33 to cover the <br />shortfall. In an effort to preclude losing the bid, Staff is recommending that the City Council consider a conditional award to <br />TEXCOR. The following actions are recommended: <br /> <br />· Instruct the City Manager conditionally award a bid to TEXCOR pending receipt of additional funding <br />from Harris County (this allows TEXCOR's bonding to remain in place). <br /> <br />· Instruct the Planning Department to withhold the Notice to Proceed pending the City's receipt and <br />acceptance of the additional $37,053.33 from Harris County, <br /> <br />Action Required by Council: <br /> <br />I. Consider and take action to conditionally award a bid to TEXCOR for the paving and extension of utilities for North 2nd Street. <br />2. Direct Staff to withhold a notice to proceed pending the receipt and acceptance of additional CDBG funding from Harris <br />County <br />Approved for City Council Al!enda <br /> <br /> <br />~/ <br /> <br />(j; <br /> <br />/1- {)h <br /> <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.