My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2007-04-14 Minutes of the City Council Retreat Meeting of La Porte City Council
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2007
>
2007-04-14 Minutes of the City Council Retreat Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:25:27 AM
Creation date
7/31/2025 11:07:57 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
4/14/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
703
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CLAUNCH & MILLER, INC. <br />Engineering Consultants <br />May 9, 2007 <br />City of La Porte <br />2963 23rd Street <br />LaPorte, Texas 77571 <br />Attention: Mr. Don Pennell <br />Assistant Director of Public Works <br />Re: Rehabilitation of Wastewater Lift Station No. 8 and No. 32 <br />City of La Porte, Texas <br />CMI Job No. 06-114 <br />Dear Mr. Pennell: <br />On May 1, 2007 the City of La Porte opened bids for the above referenced project. The <br />low bid was approximately 14% higher per lift station than the cost to construct Lift <br />Station #9 in 2004. The following are reasons for the construction increase: <br />1. Pumps and Electronic Controls <br />During the design phase of the project our electrical engineering sub - <br />consultant, Shrader Engineering Co., Inc., contacted CMI about the escalating <br />costs of the lift station electrical controls and pumps. Shrader projected that <br />the cost for the wiring, all controls, and pumps would be approximately <br />$88,300 per lift station. This cost is significantly higher than was experienced <br />in 2004. <br />2. Traffic Control <br />The site of Lift Station #32 is located adjacent to Underwood Drive which is a <br />highly traveled five (5) lane roadway. During the rehabilitation process <br />Underwood will have one lane closed down to provide access for the <br />construction and diversion pumping of the lift station. This additional traffic <br />control added cost to the project. <br />3. Diversion Pumping <br />The diversion pumping of the lift stations is more complicated than in the <br />previous rehabilitation project. These processes have increased the cost of the <br />rehabilitation of the lift stations. <br />4635 Southwest Freeway, Suite 1000 • Houston, Texas 77027-7169 • 713-622-9264 • Fax 713-622-9265 <br />
The URL can be used to link to this page
Your browser does not support the video tag.