My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2008-01-14 Regular Meeting and Workshop of La Porte City Council
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2008
>
2008-01-14 Regular Meeting and Workshop of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:23 PM
Creation date
7/31/2025 11:09:52 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
1/14/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Attachment B <br />Contract No. 08-090-000 <br />Page 1 of 1 <br /> <br />SYL VAN BEACH SHORELINE PROTECTION & BEACH NOURISHMENT <br />CEPRA PROJECT No. 1404 <br />ENGINEERING DESIGN AND CONSTRUCTION WORK PLAN <br /> <br />1. To address erosion at Sylvan Beach, the GLO shall: <br /> <br />a. Identify, document, and confer with the Qualified Project Partner, the location <br />and extent of the project area. <br />b. Confirm with the Qualified Project Partner, the preferred alternative(s) for <br />erosion response at the project site. <br />c. Contract with a professional services provider to: <br />document and survey existing conditions as required <br />verify that all permit requirements have been met; <br />complete final design and construction drawings as needed; <br />estimate construction costs; <br />provide plans, specifications and competitive sealed proposal package; <br />provide construction solicitation and procurement assistance; <br />perform construction management; and <br />conduct post-project closeout program. <br />d. Procure construction contractor through the competitive sealed proposal <br />process for construction services. <br />e. Estimate total project costs and cost-sharing requirements. <br />f. Provide financial point of contact. <br /> <br />2. To address erosion at Sylvan Beach, the Qualified Project Partner shall: <br /> <br />a. Confer with the GLO, the location and extent of the project area. <br />b. Confer and cooperate with the GLO on the selection of the professional <br />service provider, selection of preferred alternative, development of a scope of <br />work, and development of a construction plan. <br />c. Confer and cooperate with the GLO with procuring a construction contractor. <br />d. Identify, document, and coordinate with the GLO any in-kind services that <br />will count toward the cost-sharing requirement under this Agreement: <br />labor; <br />contractual; <br />volunteers; <br />equipment; and <br />supplies. <br />e. Provide financial point of contact. <br /> <br />. <br />. . <br /> <br />.. <br />- ... <br /> <br />- .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.