My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2008-11-10 Regular Meeting, Public Hearing and Workshop Meeting of the La Porte City Council
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2008
>
2008-11-10 Regular Meeting, Public Hearing and Workshop Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:22:12 AM
Creation date
7/31/2025 11:11:23 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
11/10/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
41AIA Document A201'm —1997 <br />General Conditions of the Contract for Construction <br />for the foilo ing PROJECT: <br />(Name and location or address): <br />City of La Porte - westside Park Project <br />3600 Canada Road <br />Laporte, TX 77571 <br />THE OWNER: <br />(Name and address): <br />City of La Porte <br />1322 South Broadway <br />LaPorte, Texas 77572 <br />THE ARCHITECT: <br />(Name and address): <br />Randall -Porterfield Architects, Inc. A.I.A. <br />565 FM 270 North <br />League City, Texas 77573 <br />TABLE OF ARTICLES <br />1 GENERAL PROVISIONS <br />2 OWNER <br />3 CONTRACTOR <br />4 ADMINISTRATION OF THE CONTRACT <br />5 SUBCONTRACTORS <br />6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS <br />7 CHANGES IN THE WORK <br />8 TIME <br />9 PAYMENTS AND COMPLETION <br />10 PROTECTION OF PERSONS AND PROPERTY <br />11 INSURANCE AND BONDS <br />12 UNCOVERING AND CORRECTION OF WORK <br />13 MISCELLANEOUS PROVISIONS <br />14 TERMINATION OR SUSPENSION OF THE CONTRACT <br />ADDITIONS AND DELETIONS: <br />The author of this document has <br />added Information needed for Its <br />completion. The author may also <br />have revised the text of the original <br />AIA standard form. An Additions and <br />Deletions Report that notes added <br />information as well as revisions to <br />the standard form text is available <br />from the author and should be <br />reviewed. A vertical line in the left <br />margin of this document indicates <br />where the author has added <br />necessary information and where <br />the author has added to or deleted <br />from the original AIA text. <br />This document has important legal <br />consequences. Consultation with an <br />attorney is encouraged with respect <br />to its completion or modification. <br />This document has been approved <br />and endorsed by The Associated <br />General Contractors of America <br />AIA Document A201 TM-1997. Copyright 0 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American <br />(nit. <br />Institute of Architects. All rights reserved. WARNING: This A10 Document Is protected by U.S. Copyright Law and International Trestles. Unauthorized <br />reproduction or distribution of this AIA® Document, or any portion of 1% may result In severe civil and criminal penalties, and will be prosecuted to the <br />/ maximum extent possible under the law. This document was produced by AIA software at 14:41:00 on 12110/2008 under Order No.1000375455_1 which <br />expires on 1012012009, and is not for resale. (3925236195) <br />User Notes: <br />
The URL can be used to link to this page
Your browser does not support the video tag.