3.3.2, 3.4.3, 3.8.1, 3.9, 3.18.2, 4.2.3, 4.2.6, 10 2, 103,
<br />11.1.1, 11.4.7, 14.1, 14.2.1.1,
<br />Contractor's Liability Insurance
<br />11.1
<br />Contractor's Relationship with Separate Contractors
<br />and Owner's Forces
<br />3.12.5, 3.14.2, 4.2.4, 6, 11.4.7, 12.1.2, 12.2.4
<br />Contractor's Relationship with Subcontractors
<br />1.2.2, 3.3.2, 3.18.1, 3.18.2, 5, 9.6.2, 9.6.7, 9.10.2,
<br />11.4.1.2, 11.4.7, 11.4.8
<br />Contractor's Relationship with the Architect
<br />1.1.2, 1.6, 3.1.3, 3.2.1, 3.2.2, 3.2.3, 3.3.1, 3.4.2, 3.5.1,
<br />3.7.3, 3.10, 3.11, 3.12, 3.16, 3.18, 4.1.2, 4.1.3, 4.2,
<br />4.3.4, 4.4.1, 4.4.7, 5 2, 6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4,
<br />9.5, 9.7, 9.8, 9.9, 10.2.6, 10.3, 11.3, 11.4.7, 12,
<br />13.4.2, 13.5
<br />Contractor's Representations
<br />1.5.2, 3.5.1, 3.12.6, 6.2.2, 8.2.1, 9.3.3, 9.8.2
<br />Contractor's Responsibility for Those Performing the
<br />Work
<br />3.3.2, 3.18, 4.2.3, 4.3.8, 5.3.1, 6.1.3, 6.2, 6.3, 9.5. 1,
<br />10
<br />Contractor's Review of Contract Documents
<br />1.5.2, 3.2, 3.7.3
<br />Contractor's Right to Stop the Work
<br />9.7
<br />Contractor's Right to Terminate the Contract
<br />4.3.10, 14.1
<br />Contractor's Submittals
<br />3.10, 3.11, 3.12, 42.7, 52.1, 5.2.3, 7.3.6, 92, 9.3,
<br />9.8.2, 9.8.3, 99.1, 9.10.2, 9.10.3, 11.1.3, 1152
<br />Contractor's Superintendent
<br />3.9, 10.2.6
<br />Contractor's Supervision and Construction
<br />Procedures
<br />1.22, 33, 3.4, 3.12.10, 4.2.2, 423, 4.3.3, 6.1.3,
<br />6.2.4, 7.1.3, 7.3.4, 7.3.6, 8.2, 10, 12, 14
<br />Contractual Liability Insurance
<br />1L1.L$, 112, 11.3
<br />Coordination and Correlation
<br />1.2, 1.5.2, 3.3.1, 3.10, 3.12.6, 6.1.3, 6.2.1
<br />Copies Furnished of Drawings and Specifications
<br />1.6, 2.2.5, 3.11
<br />Copyrights
<br />1.6, 3.17
<br />Correction of Work
<br />2.3, 2.4, 3.7.4, 4.2.1, 9.4.2, 9.8.2, 9.8.3, 9.9.1, 12.1.2,
<br />12.2, 13.7.1.3
<br />Correlation and Intent of the Contract Documents
<br />1.2
<br />Cost, Definition of
<br />73.6
<br />Costs
<br />2.4, 3.2.3, 3.7.4, 3.82, 3.15.2, 4.3, 5.4.2, 6.1.1, 6.2.3,
<br />7.3.3.3, 7.3.6, 7.3.71, 7.3.8, 9.10.2, 10.3 2, 10.5, 11.3,
<br />11.4,12.1,12.2.1,12.2.4,135,14
<br />Cutting and Patching
<br />6.2.5, 3.14
<br />Damage to Construction of Owner or Separate
<br />Contractors
<br />3.14.2, 62.4, 92.1.5, 10.2.12, 10 2.5, 10.6, 11.1,
<br />11.4, 12.2.4
<br />Damage to the Work
<br />3.14.2, 9.9.1, 10.2.1.2, 10.2.5, 10.6, 11.4, 12.2.4
<br />Damages, Claims for
<br />3.2.3, 3.18, 4.3.10, 6.1.1, 8.3.3, 9.5.1, 9.6.7, 10.3.3,
<br />11.1.1,11.4.5,11.4.7,14.1.3,14.2.4
<br />Damages for Delay
<br />6.1.1, 8.3.3, 9.5.1.6, 9.7, 10.3.2
<br />Date of Commencement of the Work, Definition of
<br />8.1.2
<br />Date of Substantial Completion, Definition of
<br />8.1.3
<br />Day, Definition of
<br />8.1.4
<br />Decisions of the Architect
<br />42.6,4:1-7,4'.11,42.12,4.2.13,4.3.4,4.4.1,4.4.5,
<br />4.4.6, 4.5, 6.3, 7.3.6, 7.3.8, 8.1.3, 8.3.1, 9.2, 9.4,
<br />9.5.1, 9.8.4, 9.9.1, 13.5.2, 14.2.2, 14.2.4
<br />Decisions to Withhold Certification
<br />9.4.1, 9.5, 9.7, 14.1.1.3
<br />Defective or Nonconforming Work, Acceptance,
<br />Rejection and Correction of
<br />2.3, 2.4, 3.5.1, 4.2.6, 6.2.5, 9.5.1, 9.5.2, 9.6.6, 9.8.2,
<br />9.9.3, 9.10.4, 12.2.1, 13.7.1.3
<br />Defective Work, Definition of
<br />3.5.1
<br />Definitions
<br />1.1, 2.1.1, 3.1, 3.5.1, 3.12.1, 3.12.2, 3.12.3, 4.1.1,
<br />4.3.1,5.1,6.1.2,7.2.1,7.3.1,7.3.6,8.1, 9.1,9.8.1
<br />Delays and Extensions of Time
<br />3.2.3, 4.3.1, 4.3.4, 4.3.7, 4.4.5, 5.2.3, 7.2.1, 7.3.1,
<br />7.4.1, 8.3, 9.5.1, 9.7.1, 10.3.2, 10.6.1, 14.3.2
<br />Disputes
<br />4.1.4, 4.3, 4.4, 4.5, 4.6, 6.3, 7.3.8
<br />Documents and Samples at the Site
<br />3.11
<br />Drawings, Definition of
<br />1.1.5
<br />Drawings and Specifications, Use and Ownership of
<br />1.1.1, 1.3, 2.2.5, 3.11, 5.3
<br />Effective Date of Insurance
<br />82.2, 11.1.2
<br />Emergencies
<br />4.3.5,10.6, 14.1.1.2
<br />Employees, Contractor's
<br />3.3.2, 3.4.3, 3.8.1, 3.9, 3.18.2, 4.2.3, 4.2.6, 10.2, 10.3,
<br />11.1.1, 11.4.7,14.1, 14.2.1.1
<br />Equipment, Labor, Materials and
<br />1. 1.3, 1.1.6, 3.4, 3.5.1, 3.8.2, 3.8.3, 3.12, 3.13, 3.15. 1,
<br />4.2.6, 4.2.7, 5.2.1, 6.2.1, 7.3.6, 9.3.2, 9.3.3, 9.5.1.3,
<br />9.10.2,10.2.1,102.4,14.2.12
<br />Execution and Progress of the Work
<br />IniL AIA Document A201TM —1997. Copyright 0 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American
<br />Institute of Architects. All rights reserved. WARNING: This AIO Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized
<br />reproduction or distribution of this AIA® Document, or any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the
<br />/ maximum extent possible under the law. This document was produced by AIA software at 14:41:00 on 12/10/2008 under Order No.1 0003754551 which
<br />expires on 10,120,12009, and is not for resale.
<br />User Notes: (3925236195)
<br />
|