Laserfiche WebLink
5 <br />Subcontractors, Work by <br />1.2.2, 3.3.2, 3.12.1, 4.2.3, 5.2.3, 5.3, 5.4, 9.3.1.2, <br />9.6.7 <br />Subcontractual Relations <br />5.3, 5.4, 9.3.1.2, 9.6, 9.10 10.2.1, 11.4.7, 11.4.8, 14.1, <br />14.2.1,143.2 <br />Submittals <br />1.6, 3.10, 3.11, 3.12, 4.2.7, 5.2.1, 5.2.3, 7.3.6, 9.2, <br />9.3, 9.8, 9.9.1, 9.10.2, 9.10.3, 11.1.3 <br />Subrogation, Waivers of <br />6.1.1, 11.4.5,11A.7 <br />Substantial Completion <br />4.2.9, 8.1.1, 8.1.3, 8.2.3, 9.4.2, 9.8, 9.9.1, 9.10.3, <br />9.10.4.2, 12.2, 13.7 <br />Substantial Completion, Definition of <br />9.8.1 <br />Substitution of Subcontractors <br />5.2.3, 5.2.4 <br />Substitution of Architect <br />4.1.3 <br />Substitutions of Materials <br />3.4.2, 3.5.1, 73.7 <br />Sub -subcontractor, Definition of <br />5.1.2 <br />Subsurface Conditions <br />4.3.4 <br />Successors and Assigns <br />13.2 <br />Superintendent <br />39,102.6 <br />Supervision and Construction Procedures <br />1.2.2, 3.3, 3.4, 3.12.10, 4.2.2, 4.2.7, 4.3.3, 6.1.3, <br />6.2.4, 7.1.3, 7.3.6, 8.2, 8.3.1, 9A.2,10, 12,14 <br />Surety <br />4.4.7,5.4.1.2,9.8.5,9.10.2,9.10.3,14.221 <br />Surety, Consent of <br />9.10.2, 9.10.3 <br />Surveys <br />2.2.3 <br />Suspension by the Owner for Convenience <br />14.4 <br />Suspension of the Work <br />5.4.2, 14.3 <br />Suspension or Termination of the Contract <br />4.3.6, 5.4.1.1, 11.4.9, 14 <br />Taxes <br />3.6, 3.8.2.1, 7.3.6.4 <br />Termination by the Contractor <br />4.3.10, 14.1 <br />Termination by the Owner for Cause <br />4.3.10, 5.4.1.1, 14.2 <br />Termination of the Architect <br />4.1.3 <br />Termination of the Contractor <br />14.2.2 <br />TERMINATION OR SUSPENSION OF THE <br />CONTRACT <br />14 <br />Tests and Inspections <br />3.1.3, 3.3.3, 4.2.2, 4.2.6, 4.2.9, 9.4.2, 9.8.3, 9.9.2, <br />9.10.1, 10.3.2, 11.4.1.1, 12.2.1,13.5 <br />TIME <br />8 <br />Time, Delays and Extensions of <br />3.2.3, 4.3.1, 4.3.4, 4.3.7, 4.4.5, 5.2.3, 7.2.1, 7.3.1, <br />7.4.1, 8.3, 9.5.1, 9.7.1, 10.3.2, 10.6.1, 14.3.2 <br />Time Limits <br />2.1.2, 2.2, 2.4, 3.2.1, 3.7.3, 3.10, 3.11, 3.12.5, 3.15. 1, <br />4.2, 4.3, 4.4, 4.5, 4.6, 5.2, 5.3, 5.4, 6.2.4, 7.3, 7.4, <br />8.2, 9.2, 9.3.1, 9.3.3, 9.4.1, 9.5, 9.6, 9.7, 9.8, 9.9, <br />9.10,11.1.3,11.4.1.5, 11.4.6,11.4.10,12.2,13.5, <br />13.7, 14 <br />Time Limits on Claims <br />4.3.2, 4.3.4, 4.3.8, 4.4, 4.5, 4.6 <br />Title to Work <br />9.3.2, 93.3 <br />UNCOVERING AND CORRECTION OF <br />WORK <br />12 <br />Uncovering of Work <br />12.1 <br />Unforeseen Conditions <br />4.3.4, 8.3.1, 10.3 <br />Unit Prices <br />4.3.9, 7.3.3.2 <br />Use of Documents <br />1.1.1, 1.6,2.2.5,3.12.6,5.3 <br />Use of Site <br />3.13, 6.1_l, 6.2.1 <br />Values, Schedule of <br />9.2, 9.3.1 <br />Waiver of Claims by the Architect <br />13.4.2 <br />Waiver of Claims by the Contractor <br />4.3.10, 9.10.5, 11.4.7, 13.4.2 <br />Waiver of Claims by the Owner <br />4.3.10, 9.9.3, 9.10.3, 9.10.4, 11.4.3, 11.4.5, 11.4.7, <br />12.2.2.1, 13.4.2, 14.2.4 <br />Waiver of Consequential Damages <br />4.3.10, 14.2.4 <br />Waiver of Liens <br />9.10.2, 9.10.4 <br />Waivers of Subrogation <br />6.1.1, 11.45, 11.4.7 <br />Warranty <br />3.5, 42.9, 4.3.53, 9.3.3, 9.8.4, 9.9.1, 9.10.4,12.2.2, <br />13.7.1.3 <br />Weather Delays <br />4.3.7.2 <br />Work, Definition of <br />1.1.3 <br />Written Consent <br />AtA Document A201 n —1997. Copyright t9 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American <br />Init. Institute of Architects. All rights reserved. WARNING: This A10 Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 8 <br />reproduction or distribution of this AIAe Document, or any portion of 1% may result In severe civil and criminal penalties, and will be prosecuted to the <br />/ maximum extent possible under the law. This document was produced by AIA software at 14:41 00 on 1 V10/2008 under Order No_1000375455 1 which <br />expires on 10,120,12009, and is not for resale. <br />User Notes: (3925236195) <br />