My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2008-11-10 Regular Meeting, Public Hearing and Workshop Meeting of the La Porte City Council
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2008
>
2008-11-10 Regular Meeting, Public Hearing and Workshop Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:22:12 AM
Creation date
7/31/2025 11:11:23 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
11/10/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE OF CONTENTS <br />ARTICLE 1 GENERAL PROVISIONS <br />§ 1.1 Relationship of the Parties <br />§ 1.2 General Conditions <br />ARTICLE 2 CONSTRUCTION MANAGER'S RESPONSIBILITIES <br />§ 2.1 Preconstruction Phase <br />§ 2.2 Guaranteed Maximum Price Proposal and Contract Time <br />§ 2.3 Construction Phase <br />§ 2.4 Professional Services <br />§ 2.5 Hazardous Materials <br />ARTICLE 3 OWNER'S RESPONSIBILITIES <br />§ 3.1 Information and Services <br />§ 3.2 Owner's Designated Representative <br />§ 3.3 Architect <br />§ 3.4 Legal Requirements <br />ARTICLE 4 COMPENSATION AND PAYMENTS FOR PRECONSTRUCTION PHASE SERVICES <br />§ 4.1 Compensation <br />§ 4.2 Payments <br />ARTICLE 5 COMPENSATION FOR CONSTRUCTION PHASE SERVICES <br />§ 5.1 Compensation <br />§ 5.2 Guaranteed Maximum Price <br />§ 5.3 Changes in the Work <br />ARTICLE 6 COST OF THE WORK FOR CONSTRUCTION PHASE <br />§ 6.1 Costs to Be Reimbursed <br />§ 6.2 Costs Not to Be Reimbursed <br />§ 6.3 Discounts, Rebates and Refunds <br />§ 6.4 Accounting Records <br />ARTICLE 7 CONSTRUCTION PHASE <br />§ 7.1 Progress Payments <br />§ 7.2 Final Payment <br />ARTICLE 8 INSURANCE AND BONDS <br />§ 8.1 Insurance Required of the Construction Manager <br />§ 8.2 Insurance Required of the Owner <br />§ 8.3 Performance Bond and Payment Bond <br />ARTICLE 9 MISCELLANEOUS PROVISIONS <br />§ 9.1 Dispute Resolution <br />§ 9.2 Other Provisions <br />ARTICLE 10 TERMINATION OR SUSPENSION <br />§ 10.1 Termination Prior to Establishing Guaranteed Maximum Price <br />§ 10.2 Termination Subsequent to Establishing Guaranteed Maximum Price <br />§ 10.3 Suspension <br />ARTICLE 11 OTHER CONDITIONS AND SERVICES <br />Init.AIA Document At 21 TMCMc - 2003 and AGC Document 565. Copyright © 1991 and 2003 by The American Institute of Architects and The Associated <br />General Contractors of America. All rights reserved. WARNING: This document is protected by U.S. Copyright Law and International Treaties. 2 <br />Unauthorized reproduction or distribution of this document, or any portion of it, may result in severe civil and criminal penalties, and will be <br />/ prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:02:34 on 12/01 /2008 under Order <br />No.1000375455_1 which expires on 10/20/2009, and is not for resale. <br />User Notes: (4283007293) <br />
The URL can be used to link to this page
Your browser does not support the video tag.