My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2008-11-10 Regular Meeting, Public Hearing and Workshop Meeting of the La Porte City Council
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2008
>
2008-11-10 Regular Meeting, Public Hearing and Workshop Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:22:12 AM
Creation date
7/31/2025 11:11:23 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
11/10/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
§ 2.2.10 The Guaranteed Maximum Price shall not include in the Cost of the Work any taxes from which Owner is <br />exempt. <br />§ 2.3 CONSTRUCTION PHASE <br />§ 2.3.1 GENERAL <br />§ 2.3.1.1 The Construction Phase shall commence on the Owner's acceptance of the Construction Manager's <br />Guaranteed Maximum Price <br />(Paragraphs deleted) <br />(Paragraph deleted) <br />Proposal, full execution of Amendment No. 1, and issuance of a written Notice to Proceed. Substantial Completion <br />therefore is (365) calendar days from notice to proceed scheduled for December 2008. <br />§ 2.3.2 ADMINISTRATION <br />§ 2.3.2.1 The Construction Manager shall publicly advertise and solicit through competitive purchasing, as required <br />by law, competitive sealed bidding or competitive sealed proposals from subcontractors for the performance of all <br />major ((Exceeding $50,000) elements of the Work. The Owner shall then determine, with the advice of the <br />Construction Manager and subject to the reasonable objection of the Architect, which proposals will be accepted. <br />The Construction Manager may seek to perform portions of the Work required to be publicly advertised. If the <br />Construction Manager submits its own proposal for any portion of the Work, it shall do so in the same manner as <br />required of all subcontractors. Owner shall decide whether or not Construction Manager's proposal for self - <br />performing portions of the Project offers the best value to Owner. In opening proposals, neither Construction <br />Manager nor Owner shall disclose the contents of a proposal. All proposals shall be made public within seven days <br />after the Owner's final selection or after the award of the contract, whichever is later. If Construction Manager's <br />proposal is selected by the Owner, the proposed cost for the self -performed work shall be paid to the Construction <br />Manager, pursuant to progress payments, as if Construction Manager were a subcontractor. Such payments to <br />Construction Manager shall be included in the Cost of the Work, but the Construction Manager shall not receive an <br />additional Construction Manager's fee for self -performed work. <br />§ 2.3.2.2 If during the course of recommending proposals, the Construction Manager recommends in writing to <br />Owner a proposal from subcontractor, but the Owner requires another proposal to be accepted, the Owner may <br />compensate the Construction Manager by a change in price, time, and/or Guaranteed Maximum Price for any <br />additional cost and risk that the Construction Manager may incur as a result, if such change exists. Construction <br />Manager shall state the additional cost and/or risk in writing and shall provide written proof of same before Owner <br />compensates Construction Manager. <br />§ 2.3.2.2.1 The Construction Manager shall include the following specific notices in the formation to proposers: <br />1 The successful proposer's responsibility to provide workers' compensation insurance in <br />accordance with Texas Labor Code Chapter 406; <br />.2 The successful proposer's responsibility to pay prevailing wages pursuant to Texas Government <br />Code Chapter 2258; <br />.3 A notice of the sales tax exemption for the Project and the procedure for obtaining any required <br />exemption verification or certificate; <br />.4 The notice regarding trench and shoring safety required by Texas Health and Safety Code Section <br />756.02. <br />§ 2.3.2.2.2 Nothing herein shall preclude the Construction Manager from including other notices required or allowed <br />by law <br />§ 2.3.2.3 Subcontracts and agreements with suppliers furnishing materials or equipment fabricated to a special design <br />shall conform to the payment provisions of Article 7 of this Agreement and shall not be awarded on the basis of cost <br />plus a fee without the prior consent of the Owner. <br />Init. AIA Document A121 TM'CMc — 2003 and AGC Document 565. Copyright© 1991 and 2003 by The American Institute of Architects and The Associated <br />General Contractors of America. All rights reserved. WARNING: This document is protected by U.S. Copyright Law and International Treaties % <br />Unauthorized reproduction or distribution of this document, or any portion of it, may result in severe civil and criminal penalties, and will be <br />/ prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:02:34 on 12/01 /2008 under Order <br />No.1000375455_1 which expires on 10/20/2009, and is not for resale. <br />User Notes: (4283007293) <br />
The URL can be used to link to this page
Your browser does not support the video tag.