My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2008-11-10 Regular Meeting, Public Hearing and Workshop Meeting of the La Porte City Council
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2008
>
2008-11-10 Regular Meeting, Public Hearing and Workshop Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:22:12 AM
Creation date
7/31/2025 11:11:23 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
11/10/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
then been issued by the Architect; (4) Contractor certifies that the Project has been constructed in compliance with <br />the Architect's or Engineer's plans, specifications and Construction Documents by completing the Texas <br />Accessibility Standards (TAS) and the completion of the Field Inspection Compliance items; and (5) Owner has <br />voted to accept the Work and approve Final Payment. Such final payment shall be made by the Owner not more <br />than 30 days after Owner approval. If Final Payment is withheld, the amount withheld shall not be greater than the <br />amount of work remaining to be performed or the amount of correction of nonconforming work. <br />§ 7.2.2 The amount of the final payment shall be calculated as follows: <br />.1 Take the sum of the Cost of the Work substantiated by the Construction Manager's final accounting <br />and the Construction Manager's Fee, but not more than the Guaranteed Maximum Price. <br />.2 Subtract amounts, if any, for which the Architect or Owner disputes, refuses or withholds payment, <br />including liquidated damages, if any. <br />.3 Subtract the aggregate of previous payments made by the Owner. <br />If the aggregate of previous payments made by the Owner exceeds the amount due the Construction Manager, the <br />Construction Manager shall reimburse the difference to the Owner. <br />§ 7.2.3 The Owner's accountants or other representatives will review and report in writing on the Construction <br />Manager's final accounting within 30 days after delivery of the final accounting to the Architect by the Construction <br />Manager. Based upon such Cost of the Work as the Owner's accountants or other representatives report to be <br />substantiated by the Construction Manager's final accounting, and provided the other conditions of Section 7.2.1 <br />have been met, the Architect will, within seven days after receipt of the written report of the Owner's accountants or <br />other representatives, either issue to the Owner a final Certificate for Payment with a copy to the Construction <br />Manager or notify the Construction Manager and Owner in writing of the Architect's reasons for withholding a <br />certificate as provided in Section 9.5.1 of the General Conditions of the Contract . The time periods stated in this <br />Section 7.2 supersede those stated in Section 9.4.1 of the General Conditions of the Contract.. <br />§ 7.2.4 If the Owner's accountants or other representatives report the Cost of the Work as substantiated by the <br />Construction Manager's final accounting to be less than claimed by the Construction Manager, the Construction <br />Manager shall be entitled to proceed in accordance with Article 9 without a further decision of the Architect. Unless <br />agreed to otherwise, a demand for mediation, or other dispute resolution as provided in the Contract Documents, of <br />the disputed amount shall be made by the Construction Manager within thirty (30) days after the Construction <br />Manager's receipt of a copy of the Architect's final Certificate for Payment. Failure to make such demand within <br />this thirty (30)-day period shall result in the substantiated amount reported by the Owner's accountants becoming <br />binding on the Construction Manager. Pending a final resolution of the disputed amount, the Owner shall pay the <br />Construction Manager the amount certified in the Architect's final Certificate for Payment. <br />§ 7.2.5 If, subsequent to final payment and at the Owner's prior written request, the Construction Manager incurs <br />costs described in Section 6.1 and not excluded by Section 6.2 (1) to correct nonconforming Work that is not the <br />fault of the Construction Manager, or (2) arising from the resolution of disputes, the Owner shall reimburse the <br />Construction Manager such costs and the Construction Manager's Fee, if any, related thereto on the same basis as if <br />such costs had been incurred prior to final payment, but not in excess of the Guaranteed Maximum Price. If the <br />Construction Manager has participated in savings, the amount of such savings shall be recalculated and appropriate <br />credit given to the Owner in determining the net amount to be paid by the Owner to the Construction Manager. <br />ARTICLE 8 INSURANCE AND BONDS <br />§ 8.1 INSURANCE REQUIRED OF THE CONSTRUCTION MANAGER <br />During both phases of the Project, the Construction Manager shall purchase and maintain insurance as will protect <br />the construction Manager, the Owner, the Owner's agents, trustees, representatives, servants, employees, and <br />officers, set forth in this Article and in Article 11 of the General Conditions of the Contract, which may arise out of <br />claims as set forth below, and which may arise out of or result from the Construction Manager's operations under <br />this Contract, whether such operations be by Construction Manager, or by any subcontractor or by anyone directly <br />or indirectly employed by any of them or by anyone for whose acts any of them may be liable. Except as to <br />Workers' Compensation insurance, Owner shall be listed as an additional insured, and said insurance shall be <br />primary as to the owner. All identified insurance coverages shall have a waiver of subrogation in favor of Owner. <br />Init. AIA Document A121 n"CMc — 2003 and AGC Document 565. Copyright © 1991 and 2003 by The American Institute of Architects and The Associated <br />General Contractors of America. All rights reserved. WARNING: This document is protected by U.S. Copyright Law and International Treaties. 7 <br />Unauthorized reproduction or distribution of this document, or any portion of it, may result in severe civil and criminal penalties, and will be <br />/ prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:02:34 on 12/01 /2008 under Order <br />No. 1 000375455_1 which expires on 10/20/2009, and is not for resale. <br />User Notes: <br />(4283007293) <br />
The URL can be used to link to this page
Your browser does not support the video tag.