Costs of materials described in the preceding Section 6.1.4.1 in excess of those actually installed but <br />required to provide reasonable allowance for waste and for spoilage. Unused excess materials, if any, <br />shall be handed the Owner's property at the completion of the Work or, at <br />the Owner's option, shall be sold by the Construction Manager; amounts realized, if any, from such <br />sales shall be credited to the Owner as a deduction from the Cost of the Werk-.Work and the <br />Guaranteed Maximum Price. <br />PAGE 13 <br />Costs, including transportation, installation, maintenance, dismantling and removal of materials, <br />supplies, temporary facilities, machinery, equipment, and hand tools not customarily owned by the <br />construction workers, which are provided by the Construction Manager at the site and fully consumed <br />in the performance of the Work; and cost less salvage value on such items if not fully consumed, <br />whether sold to others or retained by the Construction Manager. Cost for items previously used by the <br />Construction Manager shall mean fair market value —value with respect to each subcontract agreement <br />throughout the Scope and <br />Rental charges for temporary facilities, machinery, equipment and hand tools not included in 5.1.l <br />and not customarily owned by the Construction Manager or construction workers, which are provided <br />by the Construction Manager at the site, whether rented F. ern the G n Manager ef others, a <br />pro .,f to sportation installation,a 1 r d t d Y-erneval th F Y Y <br />Rates site. Rates, terms of rental and quantities of equipment rented shall be consistent with current <br />area rates and fees, and be subject to the Owner's prior appre* A written responsibility for such rental <br />chimes. <br />.4 Repfedue6eri eests, eests of telegninns, <br />postage and &*press delivery ekffges telephone p t site a r-easeriable pe4y eashe*peftses F > <br />.art 44807 <br />S That per6en of the bl t 1 arid t tenee e*penses e f the r _ _ Manager' <br />- <br />el ed ..,L, a el: e of dutiesr ,1 idi 1, )I7 1 <br />.=" "g ' d ,.1,.. fgReasonable, <br />necessary and actual reproduction costs and postage and express delivery charges at the site office <br />That portion directly attributable to this Contract of the actual <br />cost of premiums for insurance and bonds at rates set by the state re latpU authority. <br />Fees of testing laboratories for tests required by the Contract ;TDocuments and paid by the <br />Construction Manager, except those related to nonconforming Work other than that for which <br />payment is permitted by Section 6.1.8.2. <br />Other actual, direct, and verifiable costs reasonably and necessarily ncurred in the performance of <br />the Work if and to the extent approved in advance in writing by the Owner Owner and only if not <br />excluded under Section 6.2. <br />PAGE 14 <br />The Cost of the Work shall also include actual costs described in Section 6.1.1 which are reasonably and necessarily <br />incurred by the Construction Manager: <br />Additions and Deletions Report for AIA Document A121 TMCMc — 2003 and AGC Document 565. Copyright © 1991 and 2003 by The American Institute of <br />Architects and The Associated General Contractors of America. All rights reserved. WARNING: This document is protected by U.S. Copyright Law and 11 International Treaties. Unauthorized reproduction or distribution of this document, or any portion of it, may result in severe civil and criminal <br />penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:02:34 on 12/01 /2008 <br />under Order No.1000375455_1 which expires on 10/20/2009, and is not for resale. <br />User Notes: <br />(4283007293) <br />