My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2009-02-23 Regular Meeting and Workshop Meeting of La Porte City Council minutes
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2009
>
2009-02-23 Regular Meeting and Workshop Meeting of La Porte City Council minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:13:50 AM
Creation date
7/31/2025 11:11:49 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
2/23/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHAPTER 5 <br />STORM WATER DESIGN CRITERIA <br />5.1 GENERAL PROVISIONS <br />Drainage Criteria for development within the City of La Porte, and where applicable within La Porte's <br />Extraterritorial Jurisdiction (E.T_J.) is dependent upon the size and type of development, the conditions <br />within the individual watershed. the conditions or design of the receiving stream. bayou., channel, roadside <br />swale, culvert, or roadway. <br />The basic objective of this policy is to minimize the threat of flooding to areas within the City and its E.T.J. <br />and to minimize the effect of continued development on individual watersheds. <br />1. The City believes that the best long-term means of accomplishing its objective is a continued <br />program of improvement and extension of the Harris County Flood Control District's system of <br />open channels. This statement recognizes the technical reality that an essential prerequisite to an <br />effective flood control program is a system of open channels capable of carrying storm runoff of <br />any type in Harris County to Galveston Bay without adversely impacting existing urban areas <br />adjacent to the charnels. <br />2. The City recognizes that both District's and City's existing open channel system is, in many <br />instances, inadequate to accomplish the goal of eliminating existing flooding conditions for <br />existing levels of urban development, or for ultimate development in the watershed. <br />3. The City therefore recommends that where required certain additional flood control facilities be <br />utilized to supplement the open channel system. Such flood control facilities shall be designed to <br />preclude flooding in areas that do not presently flood and not increase flood levels where flooding <br />now, occurs. Specifically, the City supports the use of storm water detention to supplement the <br />open channel system until long-term channel improvements can be completed, or as permanent <br />facilities where additional open channel improvements are not feasible. The result will be that <br />new development will limit or restrict the impact downstream. <br />5.1.1 All the drainage plans and construction shall meet or exceed the requirements of the City of La <br />Porte, Harris County Flood Control, Harris County, TxDOT, or any other entities having <br />jurisdiction over a facility (i.e. roadway, channel, etc.). <br />5.1.2 Unless otherwise provided for in these policies, development shall follow the Harris County Flood <br />Control District Criteria Manual for the design of Flood Control and Drainage Facilities in Harris <br />County, Texas. <br />5.1.3 If application of the policies and criteria contained in this document conflict with the City's duties <br />under the Flood Hazard Prevention Ordinance, the regulations of the Flood Hazard Prevention <br />Ordinance shall apply. <br />5.1.4 Drainage structures shall be constructed in such locations and of such size and dimensions to <br />adequately serve the development, and the contributing drainage area. In new developments, the <br />developer shall provide all the necessary easements and rights -of -way required for drainage <br />structures, including stoma sewer and open or lined channels. <br />5.2 CONSTRUCTION PLAN REQUIREMENTS <br />5.2.1 A drainage map shall be included in the construction plans. The drainage area map shall include: <br />Stonnwater Criteria Page t of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.