My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2009-05-18 Special Called Regular Meeting and Workshop of La Porte City Council minutes
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2009
>
2009-05-18 Special Called Regular Meeting and Workshop of La Porte City Council minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:24 PM
Creation date
7/31/2025 11:12:21 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
5/18/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The pipeline will be regulated by the Texas Railroad Commission as an Intrastate <br />Pipeline. All design, materials and construction will, as a minimum, comply with the <br />following codes, ordinances and standards as applicable: <br /> <br />. The Department of TranspOltation ("DOT") Standard CFR Title 49, Pmt 192- <br />"transportation of natural and other gas by pipeline", <br /> <br />. National Fire Protection Agency Code (NRP A) Chapter 70 (National Electric <br />Code), <br /> <br />. ASME B31.8. "Gas Transmission and Distribution Piping Systems, <br /> <br />. U.S. Department of Labor Regulations Title 29, CFR 1910 and 1925, <br />"Occupational Safety and Health Standards", <br /> <br />. API 1104, "Standard for Welding Pipelines and Related Facilities". <br /> <br />Linde hereby makes this statement, that it agrees to the conditions and obligations set out <br />in ORDINANCE NO. 2004 -- Of the City of La Porte Pipeline Ordinance; Section 1; <br />Article IV. Pipeline TranspOItation, Sec 102-235 Application for Pem1it 3 (j), 3 (k), and 3 <br />(I), and all sections thereof that apply, regardless if said section(s) are specifically <br />mentioned in this letter. <br /> <br />The anticipated construction start date is scheduled to begin by lune I, 2009. <br /> <br />Also enclosed herewith is a check in the amount of $ 1,000.00 for initial permit fee and <br />the appropriate insurance celtificate. If additional information is required, please contact <br />David Tumbo, at (713) 644-3219 or 713-252-2151. <br /> <br />Thank you in advance for your prompt attention to this matter. <br /> <br />Sincerely, <br /> <br />{firrv. ~tJ. O.~-co1tJ.__._--". <br /> <br />t/ <br />Ron D'Avanzo, Project Manager <br />The Linde Group <br /> <br />Cc: David Turnbo <br />
The URL can be used to link to this page
Your browser does not support the video tag.