Laserfiche WebLink
<br /> <br />City of La Porte Planning Department <br />604 West Fairmont Parkway <br />La Porte, Texas 77571 <br /> <br />Phone: (281) 471-5020 - Fax: (281) 470-5005 <br />www.laportetx.gov <br /> <br />June 9, 2009 <br /> <br />Linde Gas North America, LLC <br />575 Mountain Avenue <br />MurrayHilI, NJ 07974 <br />Attn.: RonD'Avanzo, Project Manager <br /> <br />RE: Pipeline Transportation Permit (PT -2009-002) <br /> <br />Dear Mr. D' Avanzo, <br /> <br />Your application for a permit to construct an 8" hydrogen gas pipeline within the city limits of La Porte has been <br />approved by La Porte City Council at its June 8, 2009 meeting. You are hereby authorized to begin construction <br />within all regulations set forth in City of La Porte Ordinance 2004-2755: <br /> <br />Please note that this permit is issued with the following conditions: <br /> <br />1. Contact the City of La Porte Planning Department at (281) 470-5059 no less than 48 hours prior to <br />commencement of construction. <br /> <br />2. Post copies of Permit at all public right-of-way crossings. <br /> <br />3. Per Sec. 102-235, Item (k) of La Porte's Code of Ordinances (Ord. 2004-2755): "the Permittee shall, at <br />any time in the future, where such pipeline or portion thereof crosses or is laid within, under or across any <br />street, road or utility right-of-way, drainage way or public way existing or projected at the time the permit <br />is issued, reposition such pipeline (which shall include lowering or raising the pipeline, as well as casing it, <br />if required) at the Permittee's sole expense, when the City reasonably requires such action incidental to <br />public construction or public improvement construction, maintenance and improvement of streets, water <br />lines, sanitary sewer lines, storm sewers, ditches and public utilities. The City shall give the Permittee prior <br />written notice of the need for repositioning location, and such notice shall be mailed certified mail, return <br />receipt requested, to the Permittee as designated in 1he application. The Permittee shall have six (6) months <br />to complete such. repositioning. <br /> <br />4. Any and all construction materials utilized by the pipeline contractor for access across any and all drainage <br />ditches, drainage paths and/or drainage channels shall be promptly removed by the contrdctor upon <br />completion of construction at each crossing. <br /> <br />5. Any fill material resulting from construction shall be removed or be subject to a Fill Permit from the City. <br /> <br />6. Prior to an anticipated major rain event, contractor shall fell10Ve all construction-related materials and/or <br />fill from any drainage way or roadside ditch as to not impede stormwater runoff. <br /> <br />~'r:L <br />Tim Tietj~ ~ <br />Planning Director <br /> <br />cc: Finance Department; PT -2009-02 File <br /> <br />EXl--ll B IT .~ <br />