Laserfiche WebLink
<br />REQUEST FOR CITY COUNCIL AGENDA ITEM <br /> <br />Agenda Date Requested: September 14, 2008 <br /> <br />Appropriation <br /> <br />Requested By: <br /> <br />Stephen L. Barr <br /> <br />Source of Funds: FEMA Sylvan Reach Escrow <br /> <br />Department: <br /> <br />Parks & Recreation <br /> <br />Acc't Number: 1-000-202-0610 <br /> <br />$479,314 & $231,560 <br /> <br />Report: _Resolution: _Ordinance: <br /> <br />Amount Available: <br /> <br />Exhibits: <br /> <br />Architectural Contract <br /> <br />Amount Requested: <br /> <br />49,750 <br /> <br />Exhibits: <br /> <br />Bud!!.eted Item: <br /> <br />YES <br /> <br />NO X <br /> <br />Exhibits: <br /> <br />SUMMARY & RECOMMENDATION <br /> <br />The Sylvan Beach Fishing Pier was heavily damaged by Hurricane Ike in September 2008. The City's agreement for <br />operation of the fishing pier calls for the City to take the lead in the replacement process. The City submitted claims for <br />insurance and through FEMA for replacement funds. Although the City of La Porte insured the pier for windstorm <br />damage, it was not insured for flood. FEMA initially set the damage response at $129,314.07, anticipating the <br />remainder from our insurance. After the insurance adjusters determined that our coverage was not applicable, FEMA <br />adjusted their damage estimate upwards by an additional $350,000, for a total of $479,314.27. This share of the funding <br />is payable to the City at the time we receive bids from qualified contractors ($479,314.27). <br />In addition, the City/County Pier Escrow Fund has a balance available for repairs of $231 ,560.02, bringing our <br />total available funding for replacement, to $710,874.29. In 2007 we solicited and received an estimate from Marine, <br />Inc., a local marine construction company, for complete removal and replacement of the pier, at +/- $450,000 (please <br />note that this is pre-Ike pricing). So, we should have enough money to remove the existing pier and pilings, replace the <br />pier, and still retain a beginning balance in the escrow for future protection. <br />The new pier will be designed in the same manner as the Seabreeze pier, which suffered much less damage <br />than the Sylvan Beach pier, with design being only one of the variables that affected the Sylvan Beach pier. Bob <br />Randall, of Randall-Porterfield Architects, designed the Seabreeze Pier and has submitted a proposal for the re-design <br />of the Sylvan Beach Pier. Total basic services proposed are $45,250 with additional services for ADA and possible <br />U.S. Army Corps of Engineer permitting costs totaling an additional $3,500; for a total proposed cost of$49,750. <br />Funding for design and demolition of the existing pier can be taken from the escrow fund, and once the design <br />is completed and bid out, the FEMA funding should be remitted and available for use. <br />Staff recommends authorization for the City Manager to execute the proposed contract. <br /> <br />Action Required bv Council: <br />Consider authorizing the City Manager to execute a contract with Randall-Porterfield Architects, <br />Inc. for demolition and re-design of the Sylvan Beach Fishing Pier. <br /> <br /> <br />~t, <br />