My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2009-08-24 Regular Meeting, Public Hearing and Workshop Meeting of La Porte City Council minutes
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2009
>
2009-08-24 Regular Meeting, Public Hearing and Workshop Meeting of La Porte City Council minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:24 PM
Creation date
7/31/2025 11:12:52 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
8/24/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Agenda Date Requested: <br /> <br />Sentember 14. 2009 <br /> <br />REQUEST FOR CITY COUNCIL AGENDA ITEM <br /> <br />Appropriation <br /> <br />Requested By: S. Gillett <br /> <br />Department: <br /> <br />Public Works <br /> <br />Report: X Resolution: <br /> <br />Ordinance: <br /> <br />Exhibits: <br /> <br />Source of Funds: <br /> <br />GEN957 <br /> <br />Account Number: <br /> <br />015-9892-957-11 00 <br /> <br />Amount Budgeted: $1.000.000 <br /> <br />Amount Requested: $206.450 <br /> <br />Proposal to Perform Preliminary Engineering <br /> <br />Budgeted Item: Yes <br /> <br />Exhibits: <br /> <br />Agreement <br /> <br />Exhibits <br /> <br />SUMMARY & RECOMMENDATION <br />Upon completion of the City-Wide Master Drainage Plan, Klotz was selected to perform a detailed study of drainage <br />problems in Fairmont Park East, specifically along Fleetwood Drive and adjacent streets. The initial results of this study <br />were presented to the Drainage and Flooding Committee on June 24, 2009. After discussion and comments from <br />Committee Members, staff and area residents, Klotz examined, in detail, two (2) alternatives and made recommendations at <br />a subsequent meeting on July 29,2009 to consider a combination of the two (2) alternatives. After discussion and comments <br />from Committee Members, staff and area residents at the August 19, 2209 meeting, The Committee directed staff to <br />negotiate a contract to prepare a Preliminary Engineering Report (PER) to evaluate all alternatives and recommend a cost- <br />effective solution to the problem. Once the PER is completed and accepted, final design and construction can begin on the <br />final selected solution. Klotz has presented an Engineering Agreement to perform the Preliminary Engineering Report <br />(attached). The cost of the Proposal is as follows: <br /> <br />Basic Services - Lump Sum <br />XP-SWMM Modeling <br />No-Impact Report (Flood Control) <br />Preliminary Design <br />Prepare PER <br />Reimbursable Expenses <br />Subtotal Lump Sum <br />Basic Services - Not to Exceed <br />Project Management/Meetings <br />Mitigation Plan (Flood Control) <br />Address Comments - City and Flood Control <br />Subtotal Not to Exceed <br />Additional Services <br />Geotechnical Analysis <br />Surveying <br />Subtotal Additional Services <br /> <br /> <br />$22.500 <br />6,500 <br />24,500 <br />19,200 <br />~ <br /> <br />$ 73,100 <br /> <br />$20,900 <br />10,500 <br />14.800 <br /> <br />. ----- <br /> <br />$ 46,200 <br /> <br />$ 7,700 <br />79.450 <br /> <br />$ 87.150 <br />$206.450 <br /> <br />uired b Council: Authorize the City Manager to execute an agreement with Klotz Associates to <br />eliminary Engineering Report for the Fleetwood Drive Street and Drainage Project for a total cost of <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.