My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2009-08-24 Regular Meeting, Public Hearing and Workshop Meeting of La Porte City Council minutes
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2009
>
2009-08-24 Regular Meeting, Public Hearing and Workshop Meeting of La Porte City Council minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:24 PM
Creation date
7/31/2025 11:12:52 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
8/24/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CITY COUNCIL DRAINAGE REPORT <br />SEPTEMBER 14, 2009 <br /> <br />Klotz Design and Contract Construction <br />Design of Sheet Flow Relief Structure Improvements to Creekmont, Fairmont <br />Park West. Brookglen and Fairmont Park East. Design is 95% complete. Staff is <br />currently reviewing plans and identifying needed easements for construction. <br />Affected property owners have been notified by letter of the easement requests, <br />and need for acquisition. Survey of required easements will begin after initial <br />contact with residents. Individual, on-site meetings were held with seven (7) <br />owners of easements along proposed sheet flow paths to advise them of upcoming <br />construction and to hear their concerns. Meetings are going well. Three (3) more <br />are scheduled - four (4) more as yet unscheduled. <br />. Drainage Study of Brookglen and Fairmont Park East. The Consultant has <br />presented a revised recommendation at the Drainage and Flooding Committee <br />meeting scheduled for August 19, 2009. Staff was directed to negotiate an <br />agreement with Klotz Associates to prepare a Preliminary Engineering Report, <br />incorporating detailed survey data with hydraulic modeling to determine the best <br />mix of the three (3) alternatives presented. The Agreement will be presented to <br />City Council for consideration at the September 14, 2009 meeting. <br /> <br />A meeting was held on September 2, 2009 with Mike Talbot of HCFCD to <br />discuss the Brookglen area. Apparent problems with the modeling in the <br />Brookglen area were discussed along with options and solutions. Talbot was <br />willing to work with our more detailed engineering information on the B1l2-02 <br />plan as long as the information supports an abatement of losses. <br /> <br />The next buyout application is due by end of September. They need us to confirm <br />their candidate list taking into account the effects of B112-02 improvements and <br />avoiding the checkerboard effects to the community as much as possible. Made <br />request for 2008 LIDAR GIS layer available in l' contour. Made request for GIS <br />buyout layer. (Received latest map listing of SRL eligible candidates 8-30-09). <br /> <br />Draft letter to Brookglen residents is complete and under final review. Letter <br />details our four-prong approach to making Brookglen more flood resistant. Letter <br />will be sent out in September. <br /> <br />In-House Design and Construction ofProiects Identified in the Drainage Master Plan. <br />· Farrington at B106-00-00. Design complete. Construction was scheduled for <br />August, but has been moved to September. <br />· Valleybrook (Glen Meadows). Designed as a sheet flow path through property <br />scheduled for Federal Buy-Out, the property owner has declined the buy-out, <br />rendering the design moot. Staff has contacted residents on both sides of the <br />proposed outfall - they are willing to move fences and allow a concrete flume to <br />be constructed. In-house design is underway. <br />
The URL can be used to link to this page
Your browser does not support the video tag.