My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2010-10-11
LaPorte
>
.Minutes
>
City Council
>
2010's
>
2010
>
2010-10-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:25 PM
Creation date
7/31/2025 11:13:33 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
10/11/2010
Sticky Note
ID:
1
Text:
Due to the volume of the document, to view the project manual please see the binder in the vault.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />REQUEST FOR CITY COUNCIL AGENDA ITEM <br /> <br />Agenda Date Requested: <br /> <br />October 11. 2010 <br /> <br />Appropriation <br /> <br />Source of Funds: <br /> <br />GEN957 <br /> <br />Requested By: S. Gillett <br /> <br />Account Number: <br /> <br />050-9892-957-1100 <br /> <br />Department: Public Works <br /> <br />Amount Budgeted: $ 2.000.000 <br /> <br />Report: X Resolution: <br /> <br />Ordinance: <br /> <br />Amount Requested: $1.833.380 <br /> <br />Exhibits: <br /> <br />Engineer's Recommendation <br /> <br />Budgeted Item: Yes <br /> <br />Exhibits: <br /> <br />Bid Tabulation <br /> <br />Exhibits <br /> <br />SUMMARY & RECOMMENDATION <br />On September 14,2009, the Drainage and Flooding Committee heard the results of a detailed study <br />performed by Klotz and Associates regarding drainage problems on Fleetwood Drive and adjacent <br />streets. The Committee directed staff to negotiate a contract to prepare a Preliminary Engineering <br />Report (PER) to evaluate all alternatives and recommend a cost-effective solution to the problem. The <br />PER was completed and alternatives were presented to the Committee on February 16, 2010 and <br />March 1, 2010 to select an alternative to recommend to the City Council. The Committee voted to <br />recommend Alternative 5a, including the recommendation to extend the storm sewer north to North <br />Sycamore Street. Klotz and Associates was authorized to provide Final Design and Construction <br />Phase Services for the selected alternative. <br /> <br />Bids were received on September 29, 2010. A total of eight (8) bids were received (bid <br />tabulation attached). Low bid was submitted by Angel Brothers in the amount of $1,797,380. <br />Angel Brothers submitted all required prequalification documentation. Due to the firm's <br />previous prequalification for several similar projects, the Engineer performed only a cursory <br />review of experience qualifications. Required financial statements were reviewed for <br />compliance with minimum bidding capacity. Angel Brothers more than qualifies financially. <br />The Engineer's estimate was $2.5M. The schedule for substantial completion is 180 days, with <br />final completion within 30 days, for a total of 220 days. <br /> <br />It is recommended that the bid be awarded to Angel Brothers Construction in the amount of <br />$1,797,380. A contingency of$36,000 (2%) is also recommended. <br /> <br /> <br />10 /~/(O <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.