My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2010-10-11
LaPorte
>
.Minutes
>
City Council
>
2010's
>
2010
>
2010-10-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:25 PM
Creation date
7/31/2025 11:13:33 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
10/11/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />UA Engineering & Surveying, Inc. <br /> <br />tA <br /> <br />11821 East Freeway <br />Suite 400 <br />Houston, Texas 77029 <br /> <br />Phone 713.450.1300 <br />Fax 713.450.1385 <br />www.ljaengineering.com <br /> <br />September 9,2010 <br /> <br />Mr. Don Pennell <br />Assistant Director of Public Works <br />City of La Porte <br />P.O. Box 1115 <br />La Porte, Texas 77572-1115 <br /> <br />Re: Assignment #6 for Engineering Services <br />City of La Porte <br />Construction Documents & Plans <br />Waterline Along Bay Area Boulevard <br />From Spencer Highway to Fairmont Parkway <br />LJA Project E170-0010 <br />Proposal 10-0324 <br /> <br />Dear Mr. Pennell: <br /> <br />LJA Engineering & Surveying Inc. is pleased to submit this assignment letter to provide engineering <br />services to the City of La Porte. The City desires to construct a waterline or waterlines along Bay <br />Area Boulevard from Spencer Highway to Fairmont Parkway. No city water distribution lines are <br />located within the area. A La Porte Area Water Authority transmission line lies within a utility <br />easement adjacent to the east side of the roadway right of way. The City desires to evaluate the <br />alternatives to provide distribution water for service and fire protection for the properties fronting <br />along both sides of Bay Area Boulevard. The initial emphasis shall be to provide water along the <br />west side of Bay Area Boulevard. <br /> <br />Except for the Scope of Services, Basis of Compensation, and Schedule of Work set forth below, <br />the rights, duties, and obligations of LJA Engineering & Surveying and the City of La Porte shall be <br />as provided in the attached general services agreement which agreement is otherwise incorporated <br />herein and made a part of this assignment letter. Acceptance by the City of this assignment letter <br />shall constitute an amendment to said general services agreement. <br /> <br />The Scope of Services, Basis of Compensation, and Schedule of Work are outlined in the following <br />paragraphs: <br /> <br />SCOPE OF SERVICES <br /> <br />The scope of services can be divided into Preliminary and Design Phase, Bidding Phase, and <br />Construction Phases. The scope of each phase and/or services is defined as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.