<br />The following is a list of streets proposed for reconstruction (Milling, full depth lime stabilized reclamation, single
<br />course chip seal & 1 1/2" asphalt). (Contractor)
<br /> City Index Means
<br /> Street Name Scooe of Work LF Width SY Cost Estimate National Ava.
<br />1. South Blackwell Main to East "A" 415 21 968 $ 20,802 $ 23,232
<br />2. South Blackwell East "A" to Park 2,320 20 5,155 $110,780 $123,720
<br />3. South Blackwell Park to Roscoe 780 18 1,560 $ 33,524 $ 37,440
<br />4. Bayside Broadway to Fondren 1,920 20 4,267 $ 91,697 $102,408
<br />5. Dwire Broadway to Bay Oaks Dr. 1,375 20 3,056 $ 65,673 $ 73,344
<br />6. Dwire Bayshore to Bay Oaks Dr. 1,110 18 2,220 $ 47,707 $ 53,280
<br />7. Bayshore Bay Oaks to Dwire 215 16 383 $ 8,231 $ 9,192
<br />8. Bay Oaks Broadway to Dead End 2,840 16 5,049 $108,503 $121,176
<br />9. Bay Colony Sunrise to East end 2.890 24 7.707 $165,623 $184.968
<br /> 13,865 30,364 $652,522 $728,736
<br />
<br />FOR I Reolacement Cost Estimate (Derived from Means Heavy Construction Cost Systems)
<br />Means National Average SY Cost / Means City Cost Index (Houston, Tx.) / Angel Bros. Estimate
<br />
<br /> Total
<br /> Unit Material labor Eauip. Total Incl. O&P
<br />320116.71 Cold Milling Asphalt Paving
<br />. 5200 Cold planing, 1" to 3" asphalt pavmt., over25,000SY SY .34 1.07 1.41 1.69
<br /> . Does not include haul cost to PW Yard
<br /> City Cost Index (Houston, TX) SY 1.49
<br /> · Angel Bros. Estimate (includes haul) SY 3.00.
<br />32 0116.73 In-Place Cold Reused Asphalt Paving
<br />. 5000 Reclamation, pulverizing and blending with existing base
<br /> . 5040 - up to 4" thick pavement, over 15,000 SY SY NA 1.01 2.04 3.05 3.79
<br /> City Cost Index (Houston, TX) SY ------------------------------. 3.65
<br /> Angel Bros. Estimate SY ------------------------------. ?
<br />313213.19 lime Soil Stabilization
<br />. 0011 Including scarification and compaction
<br /> . Hydrated lime, for base. 6% mix. 8" deep SY 3.96 1.39 2.72 8.07 9.45
<br /> City Cost Index (Houston, TX) SY ------------------------------. 8.34
<br /> Angel Bros. Estimate (8% Flv Ash) SY ------------------------------. 4.65
<br /> Angel Bros. Estimate (6% lime) Preferred SY ------------------------------ ( ? )
<br />
<br />320113.66 Fog Seal
<br />· 0010 Fog Seal/Chip Seal
<br />· 1900 Asphalt surface treatment, single course
<br />· 0.30 gal/SY asphalt material. 20#/SYaggregate
<br />· Roadway or large area
<br />
<br />City Cost Index (Houston, TX)
<br />Angel Bros. Estimate
<br />
<br />SY 1.56 .24 .22 2.02 2.32
<br />
<br />~ ------------------------------. 2~5
<br />
<br />SY - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2.00
<br />
<br />321216.13 Plant Mix Asphalt Paving
<br />· 0340 Wearing course, 1 W' thick
<br />City Cost Index (Houston, TX)
<br />Angel Bros. Estimate
<br />
<br />SY 5.15 .44 .35 5.94 6.75
<br />
<br />SY - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 5.96
<br />
<br />SY ------------------------------ 6.60
<br />
<br />Angel Bros. 08-09 overlay cost $4.32 SY
<br />
<br />National Average SY Total
<br />
<br />City Cost Index (Houston. TX) / MF2004 Weighted Average / 88.3%
<br />Angel Bros. Estimate"
<br />
<br />SY
<br />
<br />SY ------------------------__________
<br />
<br />Sy
<br />
<br />10.67
<br />
<br />3.17
<br />
<br />5.52
<br />
<br />19.36
<br />
<br />24.00
<br />
<br />21.49
<br />
<br />----------------------------------
<br />
<br />16.25**
<br />
<br />.Cost based on July '09 estimate for milling up to 6" and stockpiling @PWYard
<br />** Final SY cost does not include: Full Depth Reclamation of up to 4" thick pavement
<br />lime Stabilization
<br />
|