My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2010-7-26
LaPorte
>
.Minutes
>
City Council
>
2010's
>
2010
>
2010-7-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:25 PM
Creation date
7/31/2025 11:15:25 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/26/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />:!!: CobbFendley <br /> <br />July 15, 2010 <br /> <br />Mr. Steve Gillett <br />Director of Public Works <br />City of La Porte <br />604 West Fairmont Parkway <br />La Porte, Texas 77571 <br /> <br />VIA E-MAIL <br />ORIGINAL BY MAIL <br /> <br />Re: Recommendation of Contract Award <br />La Porte 2010 Multiple Street <br />Base Repair and Overlay <br />Sealed Bid #10030 <br />CFA No. 1012-020-00 <br /> <br />Dear Steve: <br /> <br />Bids received at 2:00 p.m. on Thursday, July 8, 2010, have been reviewed for completeness <br />and accuracy. Please find the bid tabulation that has been prepared and attached to this letter. <br /> <br />Angel Brothers Ent., Ltd., who are reputable contractors in the area, submitted the lowest total <br />bid of $876,162.60 for the full scope of work. However, the Department of Public Works has <br />decided to reduce the project scope of work. As a result, the contract for award is being <br />accompanied by Change Order No.1, which reduces the asphalt base course pavement section <br />on the full width repair streets from 8" to 6.5" in thickness and reduces the quantity of additional <br />work items. The complete description of changes can be found in Attachment "A" of Change <br />Order 1. The effective date of Change Order 1 shall be the same date that the last party fully <br />executes the contract documents. <br /> <br />Please note that the changes in the base course thickness will have little long term impacts on <br />the design life of the streets to be repaired because the cross section is comparable to design <br />pavement sections of neighboring municipalities. <br /> <br />The total amount of the contract award, including Change Order No.1 is $660,674.30. We <br />recommend award of a construction contract, with a signed Change Order No. 1 as described, <br />in the amount of $660,674.30 to Angel Brothers Ent. Ltd. <br /> <br />Sincerely, <br /> <br />Cobb Fendley <br /> <br />~~ <br /> <br />Heath Lyle, P.E. <br />Project Manager <br /> <br />cc: Harlan Hartoon, <br />Vice President, Angel Bros. <br /> <br />D:\CF A\20 10\ 12020.street_ overlay\ENG\Bid Phase\Ltr. Bid recommendallon.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.