My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-17-07 Drainage and Flooding Committee Meeting
LaPorte
>
.Minutes
>
Drainage and Flooding Committee
>
2007
>
09-17-07 Drainage and Flooding Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
7/31/2025 11:18:11 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
9/17/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT A <br />;, TO <br />OR;D1NANCE 1444-A <br /> <br /> All; Lots Small Lots Large Lots <br /> PERMIT REQUIRI:OMENTS AND CONDITIONS (less than 1 acre) /1 acre or more) <br /> 1.5 ~oads 6-49 loads 50 and more loads 6-49 Loads 50 and more Loads <br />1 Permit ReQuired .. .. .. .. <br />2 Permit Fee Assessed .. .. .. .. <br />3 180 Day Permit for Project Comoletion .. .. .. .. <br /> . <br />4 Spreadiml of Delivered Fill Must Becin within 30 Davs . .. .. .. .. <br />5 For Open Ditch Roadways Maximum Fill to be 6 roches below .. .. ... .. <br />top of adiacent crown of road <br />6 ReCommended overland slope for lot grading to be 0.2%-0.75% .. .. <br />SA For Curb & Gutter Streets, Grade Fill at 0.2%-0.75% toward , . <br />street <br />7 For Lots Abutting an Alley Way, Match the Grade of the Alley ... . <br />and Grade to Drain Toward Street' <br />B Grading & Drainage Plan submitted signed and sealed by .. .. <br />Professional Encineer licensed in the State of Texas <br />8A Storm Water pollution Prevention Plan and Revegetation Plan . .. <br />submitted <br />88 Demonstration that Watershed. is Not Being Adversely .. .. . <br />Impacted <br />BC Grade of swales to be customed/enClineered for each site .. . <br />9 Sketch, Surveyor Site Plan Showing Proposed Fill Placement .. .See Item 8 .. .See Item 8 <br />and Location of Proposed Drainaae drawn to scale <br />10 Sill Prevention and Reveoetation olan reauired .See Notes 3&4 'See Item 8A .See Notes 3&4 . See Item SA <br />11 1 ft Top of Bank Swale Offset from Property Line '.. .. .. . <br />12 5 fI Top of Bank Swale Offset from Property Line . It .. <br />13 No Fill Unloaded within 15 ft of Prope.rtv Line . .. It <br />14 No Fill Unloaded within 5 ft of ProDertv Line : ,. It .' <br />15 Address for Site Required And Fill Must be Delivered to this '. It .. .. .. <br /> addr~ss , <br />16 Any deviation from these permit requirements Shall be Reviewed It .. .. .. <br />and Approved By the City', <br /> , . <br /> <br />. = ReqUlred.lnformalion, ActiVity or Regulation <br />Note: . .' <br />1 No dump trucks larger than 12 cY dump trucks snail be allowed for use il1deliver to addresses off truck routes. <br />2 Only one Fill Dirt Permit will be issued for anyone property orad[jres$ over a 180 day span. <br />3 Sill prevention plan shall at's minimum.consist of silt fencing or block sodding rows of Bod 2' wide along the leading edge of the filled area. <br />4 Revegetation shall consist of seeding, sprigging, sodding, turf establishment (or combination thereof) that produces an effective vegetative cover of 75% within 90 <br />days. .. . <br />
The URL can be used to link to this page
Your browser does not support the video tag.