My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-03-07 Drainage and Flooding Committee
LaPorte
>
.Minutes
>
Drainage and Flooding Committee
>
2007
>
12-03-07 Drainage and Flooding Committee
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
7/31/2025 11:18:18 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
12/3/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CITY OF LA PORTE <br />PUBLIC WORKS <br />DEPARTMENT <br /> <br />Memo <br /> <br />To: Ron Bottoms, City Manager ~. <br />From: Steve Gillett, Director of Public Works ~r ~ <br />CC: Council Drainage and Flooding Committee <br />John Joerns, Assistant City Manager <br />Wayne Sabo, Director of Planning <br />Date: 1/3/2008 <br /> <br />,- <br /> <br />Re: Request For Qualifications Evaluation <br />City-Wide Drainage Study <br /> <br />The City has received qualification statements from eleven (11) AlE firms for the <br />above referenced Study. An evaluation team was selected to review submissions <br />and score each on the criteria identified in the RFQ. The members were John <br />Joerns, Wayne Sabo, Rodney Slaton and Steve Gillett. <br /> <br />The Committee initially met to discuss and agree upon a weighing factor for each <br />selection criteria. A second meeting was held to discuss the initial evaluation of the <br />submissions, and the Committee agreed to eliminate a total of six (6) firms, based on <br />experience, proposed personnel and overall response to the RFQ. Claunch & Miller, <br />Dannenbaum, Jacobs Carter Burgess, Klotz and URS were given an in-depth review <br />by each committee member and individual rating sheets were completed. The <br />Committee then met again to discuss the individual ratings, and a combined rating <br />sheet for each firm was prepared. <br /> <br />A summary of the evaluation tabulations is attached as Exhibit I. The top respondent <br />was identified as Klotz Associates with a combined average score of 7.6625. It <br />should be noted that the entire committee selected Klotz as the top respondent. <br /> <br />. Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.