My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-13-08 Drainage and Flooding Committee minutes
LaPorte
>
.Minutes
>
Drainage and Flooding Committee
>
2008
>
10-13-08 Drainage and Flooding Committee minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
7/31/2025 11:18:23 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
10/13/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />k lot z 4~~ ass 0 cia t e s <br /> <br />recommended relief swales is low ($21,000 or less), but channel improvements and diversion <br />ponds, while having a higher cost-benefit ratio, provide greater protection against larger floods. <br />Some of the construction cost impacts on the City can be reduced by using alternative, less <br />traditional funding sources such as state or federal loans or grants, joint funding of projects in <br />cooperation with other governmental entities, or establishing a storm water utility as an <br />independent revenue source. <br /> <br />Recommended Channel Improvement and Detention Pond Projects <br />to Address Flooding Problems <br /> <br />Project Subdivision! Area Benefiting Type of Project Construction <br />ill Improvement Construction Cost Per Loss <br /> Cost Removed1 <br />13 Fairmont Park, Fairmont Park East Channel Widening $781,000 $23,000 <br />14 Brookglen Channel Lining $5,494,000 $29,400 <br />15 Meadow Park, Villa Del Rancho Channel Widening $1,701,000 $47,000 <br />16 Lennox Gardens, L Street Pond for Diversion $1,092,000 $50,000 <br />18 Battleground Estates, Pinegrove Valley, P Channel Lining $1,032,000 $54,000 <br /> Street <br />19 Shady River Channel Widening $361,000 $60,200 <br />21 Woods on the Bay, Pine Bluff, Shady Channel Widening $600,000 $75,000 <br /> River <br />23 Meadow Crest, Creekmont, Glen Pond for Diversion $8,314,000 $87,500 <br /> Meadows, Fairmont Park, Fairmont Park <br /> West <br /> Total 8 Projects $19,375,000 <br /> <br />1 Total Construction cost divided by the number of structures that have been reported in the past to have flooded and <br />for which recommended projects will alleviate flooding in the future. <br /> <br />As the cost/benefit ratio rises, projects become less economically efficient. At some point, the <br />cost/benefit ratio becomes so high as to render a project unreasonably expensive. An evaluation <br />of the costlbenefit ratio (discussed at greater length in the Engineering Summary) for various <br /> <br />ES-4 <br /> <br />Klotz Associates Project No. 0127.008.000 <br />January 2009 <br /> <br />La Porte Citywide Drainage Study <br />City of La Porte <br />
The URL can be used to link to this page
Your browser does not support the video tag.