My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-13-08 Drainage and Flooding Committee minutes
LaPorte
>
.Minutes
>
Drainage and Flooding Committee
>
2008
>
10-13-08 Drainage and Flooding Committee minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
7/31/2025 11:18:23 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
10/13/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />k lot z 4~~ ass 0 cia t e s <br /> <br />rank the various problem areas on a scale of 1 to 10, 10 representing the most severe <br />problem area. The ranks for the various subdivisions are given in Table 2-4. <br /> <br />The subdivision ranking of Table 2-4 is a ranking based upon flood problem severity as <br />reflected in drainage and flooding reports, as discussed above. Improvement in drainage, <br />as discussed at length in Letter Report No.3, will improve drainage conditions across a <br />large area of a subdivision, not just for those residences for which flooding reports have <br />been made. The estimated number of lots (in lieu of detailed information on number of <br />people in a residence) generally benefiting from drainage improvements in the general <br />vicinity of a subdivision have been also estimated; these estimates are listed in Table 2-4. <br />The number of lots likely to directly benefit from drainage improvements provides an <br />alternative method by which to judge the relative merit of drainage improvements. <br /> <br />2.3.4 Problem Areas with Short Term Drainage Project Remedy <br /> <br />Initial work in development of the CWDS examined drainage problems and potential <br />remedies developed by the City because of conditions conducive to severe flooding; these <br />problem and remedies have been detailed in Letter Report No.1. Five critical areas were <br />identified in this initial identification of drainage and flooding problems by the City (for <br />convenience these problem areas are identified as City-Identified Drainage Problem <br />Areas. These are listed in Table 2-5 and shown in Exhibit 2-12. <br /> <br />Potential remedies for reduction or elimination of localized drainage problems in these <br />City-Identified Drainage Problem Areas had been identified by the City, the distinctive <br />feature of the remedies being their ability to be quickly and relatively cheaply <br />implemented. These drainage problems, the proposed remedies, and the evaluation of the <br />proposed remedies are summarized in Table 2-5. The particular drainage problem <br />remedies for these initially identified problem areas are localized and consisted of the <br />following strategies applied in the immediate vicinity of the identified problem area: <br /> <br />2-8 <br /> <br />Klotz Associates Project No. 0127.008.000 <br />January 2009 <br /> <br />La Porte Citywide Drainage Study <br />City of La Porte <br />
The URL can be used to link to this page
Your browser does not support the video tag.