My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-13-08 Drainage and Flooding Committee minutes
LaPorte
>
.Minutes
>
Drainage and Flooding Committee
>
2008
>
10-13-08 Drainage and Flooding Committee minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
7/31/2025 11:18:23 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
10/13/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. B106-00-00 (Existing and Future Conditions) <br />. B 1 06-02-00 (Existing and Future Conditions) <br />. B106-05-00 (Existing and Future Conditions) <br />. B109-00-00 (Future Conditions) <br />. B 112-00-00 (Existing and Future Conditions) <br />. Bl12-02-00 (Future Conditions) <br />. F101-00-00 (Existing and Future Conditions) <br />. F101-03-00 (Existing and Future Conditions) <br />. F101-05-00 (Existing and Future Conditions) <br />. F 10 1-06-00 (Future Conditions) <br />. F212-00-00 (Existing and Future Conditions) <br />. F216-00-00 (Future Conditions) <br />. F216-01-00 (Existing and Future Conditions) <br /> <br />k lot z 4~. ass 0 cia t e s <br /> <br />Improvements for existing condition channels are predominately channel widening. <br />Exhibit 4-4,4-5, and 4-6 shows where widening or channel lining is proposed. Widened <br />channels are presumed to be trapezoidal in section; basic dimension are given in the <br />Tables 4-1 and 4-2. Estimated excavation for the proposed channel widening has been <br />determined from the difference in cross sectional area of the existing channel and the <br />proposed channel. Land acquisition acreage for channel widening assumes that only <br />right-of-way for maintenance berms along an existing channel must be acquired. <br />Representative land acquisition costs for undeveloped and developed land are described <br />in Section 5. It should be noted that no channel improvements are proposed for Little <br />Cedar Bayou (F216-00-00) for existing conditions. After reviewing the report titled <br />"Hydraulic Analysis for Little Cedar Bayou Watershed: HCFCD Unit F216-00-00" <br />submitted by Binkley & Barfield on January 2000, the improvements detailed in that <br />report were determined to be adequate for planning purposes. It is recommended that the <br />City pursue the improvements as specified in the aforementioned report to reduce the <br />current flooding due to lack of channel capacity. <br />4-13 <br /> <br />Klotz Associates Project No. 0127.008.000 <br />January 2009 <br /> <br />La Porte Citywide Drainage Study <br />City of La Porte <br />
The URL can be used to link to this page
Your browser does not support the video tag.