My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-13-08 Drainage and Flooding Committee minutes
LaPorte
>
.Minutes
>
Drainage and Flooding Committee
>
2008
>
10-13-08 Drainage and Flooding Committee minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
7/31/2025 11:18:23 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
10/13/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />k lot z 4~. ass 0 cia t e 5 <br /> <br />developable land, the more likely would it be that regional detention would preferred <br />over on-site detention by a developer. <br /> <br />5.2 Implementation Issues <br /> <br />In addition to construction costs and prioritization of construction projects, other factors <br />which are important to constructing or implementing various projects are the following. <br /> <br />5.2.1 Change of Information or Details of Projects <br /> <br />The descriptions of projects identified in this CWDS for possible implementation are <br />based upon available information at the time the CWDS was prepared. The level of <br />detail used in the project descriptions is appropriate to the planning level focus of this <br />study. More detailed analysis will be required for the design of particular drainage <br />remedies prior to actual construction. Some features of the proposed remedies may <br />change as more information is developed as part of detailed design. In addition, changes <br />in development patterns, land use, effects on drainage from out-of-city sources, or other <br />similar factors affecting drainage behavior may also occur. Because of such possible <br />changes, priorities for order of construction project may well change over time. <br /> <br />Consequently, drainage conditions in the City should be periodically reviewed to assess <br />whether conditions have changed sufficiently to significantly affect the character or <br />priority of construction of recommended drainage improvements as given in this CWDS. <br /> <br />5.2.2 Pre-Construction Requirements <br /> <br />Prior to development of a final design and construction of a particular project, various <br />specialized studies in addition to detailed hydraulic study will be required, including <br />detailed survey, geotechnical investigation, right-of-way investigation and delineation. <br /> <br />5-6 <br /> <br />Klotz Associates Project No. 0 I 27.008.000 <br />January 2009 <br /> <br />La Porte Citywide Drainage Study <br />City of La Porte <br />
The URL can be used to link to this page
Your browser does not support the video tag.