Laserfiche WebLink
<br />TABLE 2-5 <br />SHORT-TERM PROJECTS <br /> <br />Project Number Name Progress <br />Short Term Project 1 Catlett lane Pavement Replacement Completed and Constructed <br />Short Term Project 2 Creekmont Park Overflow Path Design Completed <br />Short Term Project 3 Drainage Improvements Along Driftwood Drive Proposed Relief Swale Path <br />Short Term Project 4 Fleetwood Drive Outfall Pipe Upsizing Proposed Outfall Pipe Upsizing <br />Short Term Project 5 Glen Meadow Subdivision Interceptor Inlet Proposed Interceptor Inlet with Additional Outlets <br /> <br />Klotz Associates Project No.: 0127.008.000 <br />January 2009 <br /> <br />City of La Porte <br />City wide Drainage Study <br />