My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-13-08 Drainage and Flooding Committee minutes
LaPorte
>
.Minutes
>
Drainage and Flooding Committee
>
2008
>
10-13-08 Drainage and Flooding Committee minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
7/31/2025 11:18:23 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
10/13/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TABLE 2-5 <br />SHORT-TERM PROJECTS <br /> <br />Project Number Name Progress <br />Short Term Project 1 Catlett lane Pavement Replacement Completed and Constructed <br />Short Term Project 2 Creekmont Park Overflow Path Design Completed <br />Short Term Project 3 Drainage Improvements Along Driftwood Drive Proposed Relief Swale Path <br />Short Term Project 4 Fleetwood Drive Outfall Pipe Upsizing Proposed Outfall Pipe Upsizing <br />Short Term Project 5 Glen Meadow Subdivision Interceptor Inlet Proposed Interceptor Inlet with Additional Outlets <br /> <br />Klotz Associates Project No.: 0127.008.000 <br />January 2009 <br /> <br />City of La Porte <br />City wide Drainage Study <br />
The URL can be used to link to this page
Your browser does not support the video tag.