My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-18-09 Drainage and Flooding Committee Meeting minutes (2)
LaPorte
>
.Minutes
>
Drainage and Flooding Committee
>
2009
>
05-18-09 Drainage and Flooding Committee Meeting minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
7/31/2025 11:18:33 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
5/18/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Table 1 <br /> <br />Fairmont Park East Subdivision <br />Summary of Storm Frequency Peak Flows for the Drainage Area <br /> <br /> Rainfall Time of <br /> Area Runoff Coefficient Intensity Peak Discharge <br /> Frequency Concentration <br /> (acres) (C) I, (in/lu) Q, (cfs) <br /> (Year) TC, (min) <br />I 3-yr 106.6 II 0.55 37.8 3.04 180.0 I <br />I 5-yr 106.6 II 0.55 37.8 3.60 225.0 I <br />I lO-yr 106.6 II 0.55 37.8 4.11 240.8 I <br />I 25-yr 106.6 II 0.55 37.8 4.80 282.0 I <br />I 100-yr 106.6 II 0.55 37.8 5.85 343.0 I <br /> <br />TB-l <br /> <br />Klotz Associates Project No. 0127.009.000 <br />May 2009 <br /> <br />Fairmont Park East & Brookglen Drainage Study <br />City of La Porte <br />
The URL can be used to link to this page
Your browser does not support the video tag.