My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-18-09 Drainage and Flooding Committee Meeting minutes (2)
LaPorte
>
.Minutes
>
Drainage and Flooding Committee
>
2009
>
05-18-09 Drainage and Flooding Committee Meeting minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
7/31/2025 11:18:33 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
5/18/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Alternative-2B <br /> <br />Remove Existing Storm Trunk Line Adjacent to the Northbound Pavement of Fleetwood Drive from <br />HCFCD Unit 8106-02-00 (Outfall) to Sycamore Dr. North and Install New Storm Trunk Designed for a 10- <br />year Event Minimize Pavement Replacement & Utility Conflicts <br /> <br />Item Item Description Unit Estimated Unit Price Total Cost <br />No. Quantity <br />1 Mobilize & Prepare Right-of-Way (5% of Total) LS 1 $ 55,800.00 $ 55,800.00 <br />2 Remove & Dispose of Existing Pavement SY 293 $ 3.10 $ 910.00 <br />3 Remove & Dispose of Existing Storm Pipe LF 3,000 $ 16.00 $ 48,000.00 <br />4 Excavation CY 3,889 $ 4.60 $ 17,890.00 <br />5 7" Reinforced Concrete Pavement Repair SY 293 $ 40.00 $ 11,740.00 <br />(Include Subgrade) <br />6 Curb Ramps EA 21 $ 3,300.00 $ 69,300.00 <br />7 Inlets Types A, B, C EA 22 $ 2,233.33 $ 49,140.00 <br />8 24" Reinforced Concrete Pipe LF 330 $ 51.00 $ 16,830.00 <br />9 60" Reinforced Concrete Pipe LF 236 $ 185.00 $ 43,660.00 <br />10 5' x 5' Reinforced Concrete Box LF 540 $ 230.00 $ 124,200.00 <br />11 7' x 5' Reinforced Concrete Box LF 310 $ 336.00 $ 104,160.00 <br />12 8' x 6' Reinforced Concrete Box LF 1,138 $ 350.00 $ 398,300.00 <br />13 9' x 6' Reinforced Concrete Box LF 724 $ 890.00 $ 644,360.00 <br />14 Manholes Include Tie in Exist. Pipe EA 11 $ 3,500.00 $ 38,500.00 <br />15 Wingwall with Headwall EA 1 $ 25,000.00 $ 25,000.00 <br />16 5" Concrete Riprap SY 75 $ 42.00 $ 3,150.00 <br />17 Cement Stabilized Sand Ton 1,417 $ 40.00 $ 56,700.00 <br />18 SWPPP LS 1 $ 20,000.00 $ 20,000.00 <br />Trunk Line & Pavement Repair - Subtotal Construction: $ 1,727,640.00 <br />10% Contingency $ 172,764.00 <br />Trunk Line & Pavement ReDair - Total Construction: $ 1,900,404.00 <br />Total Construction & Enaineerina (12%): $ 2,128,452.48 <br /> <br />Klotz Associates Project No. 0127.009.000 <br />May 2009 <br /> <br />Table 4 <br /> <br />Fairmont Park East and Brookglen Drainage Study <br />City of La Porte <br />
The URL can be used to link to this page
Your browser does not support the video tag.