My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-18-09 Drainage and Flooding Committee Meeting minutes (2)
LaPorte
>
.Minutes
>
Drainage and Flooding Committee
>
2009
>
05-18-09 Drainage and Flooding Committee Meeting minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
7/31/2025 11:18:33 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
5/18/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Alternative-4 <br /> <br />Removal and Replace Roadway with Lower Profile Grade Line for Fleetwood Drive <br />Replace Existing Storm Trunk Adjacent to Pavement <br />From HCFCD Unit 8106-02-00 (Outfall) to Spruce Dr. South (2,400 LF) <br /> <br />Item Item Description Unit Estimated Unit Price Total Cost <br />No. Quantity <br />1 Mobilize & Prepare Right-of-Way (5% of Total) LS 1 $ 88,900.00 $ 88,900.00 <br />2 Remove & Dispose of Existing Pavement SY 13,137 $ 3.10 $ 40,730.00 <br />Full Width, Intersections & Crossing Streets <br />3 Remove & Dispose of Existing Storm Pipe LF 2,715 $ 16.00 $ 43,440.00 <br />4 Roadway Excavation CY 5,355 $ 3.60 $ 19,280.00 <br />5 Storm Excavation CY 1 ,496 $ 4.60 $ 6,890.00 <br />6 7" Reinforced Concrete Pavement SY 13,137 $ 40.00 $ 525,470.00 <br />(Include Subgrade) <br />7 Curb Ramps EA 34 $ 3,300.00 $ 112,200.00 <br />8 Inlets Types A, B, C EA 34 $ 2,233.33 $ 75,940.00 <br />9 24" Reinforced Concrete Pipe for Additional Curb LF 510 $ 51.00 $ 26,010.00 <br />Return Inlets <br />10 54" Reinforced Concrete Pipe LF 305 $ 125.00 $ 38,130.00 <br />11 60" Reinforced Concrete Pipe LF 236 $ 185.00 $ 43,660.00 <br />12 6' x 5' Reinforced Concrete Box LF 589 $ 200.00 $ 117,800.00 <br />13 8' x 5' Reinforced Concrete Box LF 570 $ 295.00 $ 168,150.00 <br />14 8' x 6' Reinforced Concrete Box LF 1,015 $ 350.00 $ 355,250.00 <br />15 Manholes EA 11 $ 3,000.00 $ 33,000.00 <br />16 Wingwall with Headwall EA 1 $ 25,000.00 $ 25,000.00 <br />17 5" Concrete Riprap SY 75 $ 42.00 $ 3,150.00 <br />18 Cement Stabilized Sand Ton 1,305 $ 40.00 $ 52,220.00 <br />19 SWPPP LS 1 $ 20,000.00 $ 20,000.00 <br />Trunk Line & Roadway - Subtotal Construction: $ 1 ,795,220.00 <br />10% Contingency $ 179,522.00 <br />Trunk Line & Roadwav - Total Construction: $ 1,974,742.00 <br />Total Construction & Enaineerina (12%): $ 2,211,711.04 <br /> <br />Klotz Associates Project No. 0127.009.000 <br />May 2009 <br /> <br />Table 6 <br /> <br />Fairmont Park East and Brookglen Drainage Study <br />City of La Porte <br />
The URL can be used to link to this page
Your browser does not support the video tag.