Laserfiche WebLink
<br />B112-00-00 Bench Removal from B112-02-00 to 890- <br />feet Downstream <br /> <br />Item Item Description Unit Estimated Unit Price Total Cost <br />No. Quantity <br />1 Traffic Control LS 1 $ 10,000.00 $ 10,000.00 <br />2 Site Preparation and Restoration LS 1 $ 10,000.00 $ 10,000.00 <br />3 Concrete Liner Demolition SY 22,560 $ 6.00 $ 135,360.00 <br />4 Channel Excavation CY 4,800 $ 8.00 $ 38,400.00 <br />5 Concrete Liner (1.1:1 SS) SY 10,560 $ 40.00 $ 422,400.00 <br />6 Concrete Liner (1.5:1 SS) SY 8,640 $ 40.00 $ 345,600.00 <br />7 Transijion to 10'x8' Box Culvert LS 1 $ 5,000.00 $ 5,000.00 <br />8 Transition to Downstream End LS 1 $ 5,000.00 $ 5,000.00 <br />9 Rip Rap at Downstream End SY 500 $ 45.00 $ 22,500.00 <br />10 SWPPP LS 1 $ 10,000.00 $ 10,000.00 <br />Subtotal $ 1,004,260.00 <br /> <br />1 <br />07-2008 <br />