Laserfiche WebLink
<br />Alternative-3 <br /> <br />Add a Parallel Storm Trunk under the Northbound Pavement of Fleetwood Drive <br />From HCFCD Unit 8106-02-00 (Outfall) to Spruce Dr. North <br />Remove and Replace Northbound Pavement (2,200 LF) <br /> <br />Item Item Description Unit Estimated Unit Price Total Cost <br />No. Quantity <br />1 Mobilize & Prepare Right-of-Way (5% of Total) LS 1 $ 46,000.00 $ 46,000.00 <br />2 Remove & Dispose of Existing Pavement SY 3,300 $ 3.10 $ 10,230.00 <br />3 Remove & Dispose of Existing 60" CMP LF 155 $ 16.00 $ 2,480.00 <br />4 Excavation CY 2,722 $ 4.60 $ 12,530.00 <br />5 7" Reinforced Concrete Pavement (Include SY 3,300 $ 40.00 $ 132,000.00 <br />Subgrade) <br />6 Inlets Types A, B, C EA 18 $ 2,233.33 $ 40,200.00 <br />7 24" Reinforced Concrete Pipe LF 270 $ 51.00 $ 13,770.00 <br />8 5' x 5' Reinforced Concrete Box LF 548 $ 230.00 $ 126,040.00 <br />9 6' x 5' Reinforced Concrete Box LF 556 $ 200.00 $ 111,200.00 <br />10 7' x 5' Reinforced Concrete Box LF 581 $ 336.00 $ 195,220.00 <br />11 7' x 6' Reinforced Concrete Box LF 521 $ 330.00 $ 171,930.00 <br />12 8' x 6' Reinforced Concrete Box LF 217 $ 350.00 $ 75,950.00 <br />13 60" Equalizer Pipe Between Both Storm Trunks LF 120 $ 185.00 $ 22,200.00 <br />14 Junction Box EA 1 $ 10,000.00 $ 10,000.00 <br />15 Manholes EA 9 $ 3,000.00 $ 27,000.00 <br />16 Wingwall with Headwall EA 1 $ 25,000.00 $ 25,000.00 <br />17 5" Concrete Riprap SY 75 $ 42.00 $ 3,150.00 <br />18 Cement Stabilized Sand Ton 1,051 $ 40.00 $ 42,050.00 <br />19 Adjust & Grout Manholes EA 9 $ 1,000.00 $ 9,000.00 <br />20 SWPPP LS 1 $ 20,000.00 $ 20,000.00 <br />Trunk Line & Roadway - Subtotal Construction: $ 1,095,950.00 <br />10% Contingency $ 109,595.00 <br />Trunk Line & Roadwav - Total Construction: $ 1,205,545.00 <br />Total Construction & Enaineerina (12%): $ 1,350,210.40 <br /> <br />Klotz Associates Project No. 0127.009.000 <br />May 2009 <br /> <br />Table 5 <br /> <br />Fairmont Park East and Brookglen Drainage Study <br />City of La Porte <br />