Laserfiche WebLink
Cost Estimate for Geotechnical Engineering Services lierracon <br /> Drainage Ditch Improvements — Battleground Estates ® La Porte, Texas <br /> July 5, 2011 ® Terracon Document No. P91110112 <br /> Page 5 <br /> Details of Cost Estimate <br /> Item Description Quantity Unit Rate Amount <br /> Field Services <br /> 1 ATV Drilling Rig Mobilization 1 each $417.00 $417.00 <br /> 2 Soil Boring, 0 - 20 ft (continuous) 140 feet $18.00 $2,520.00 <br /> 3 ATV Drilling Surcharge 140 feet $6.00 $840.00 <br /> 4 Standby / Travel 2 hrs $146.00 $292.00 <br /> 5 Field Technician, Staking & Logging 10 hrs $50.00 $500.00 <br /> 6 Environmental Technician, Measuring PID's 10 hrs $50.00 $500.00 <br /> 7 Project Engineer, P.E. 4 hrs $96.00 $384.00 <br /> Sub -total for Field Exploration $5,453.00 <br /> Laboratory Testing <br /> 1 Liquid and Plastic Limits 20 each $53.00 $1,060.00 <br /> 2 Unconfined Compression 12 each $39.00 $468.00 <br /> 3 Moisture Content 10 each $8.00 $80.00 <br /> 4 Percent finer than the No. 200 Sieve 20 each $41.00 $820.00 <br /> 5 Crumb Test 6 each $33.00 $198.00 <br /> 6 Pinehole Dispersion Test 3 each $235.00 $705.00 <br /> 7 Consolidated Undrained Triaxial Test 3 each $650.00 $1,950.00 <br /> Sub -total for Laboratory Testing $5,281.00 <br /> Engineering Analysis & Reporting <br /> 1 Principal Engineer, P.E. 6 hrs $167.00 $1,002.00 <br /> 2 Project Engineer, P.E. 40 hrs $96.00 $3,840.00 <br /> 3 Support Personnel 3 hrs $36.00 $108.00 <br /> Sub -total for Engineering Reports $4,950.00 <br /> Total Not to Exceed Cost $15,684.00 <br /> Reliable ® Responsive ® Convenient w Innovative <br />