My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-09-2025 Drainage minutes
LaPorte
>
.Minutes
>
Drainage and Flooding Committee
>
2025
>
06-09-2025 Drainage minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 12:34:35 PM
Creation date
7/31/2025 11:19:04 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
6/9/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5. HCFCD PROJECT UPDATE - Presentation, discussion, and possible action <br />regarding Harris County Flood Control District (HCFCD) and Harris County <br />Precinct 2 current and future plans related to Flooding in the City of La Porte. <br />[Ray Mayo, Director of Public Works] <br />Mr. Ratliff from the Harris County Flood Control District provided brief updates, saying <br />Brookglen Phase 11 design was complete and anticipated bidding in the fourth quarter <br />of the year. Member Engelken asked for attention to limbs/branches and mowing. Mr. <br />Ratliff also had a map of the Battleground Estates desilt work to be done Tuesday <br />morning. <br />6. CURRENT DRAINAGE PROJECT UPDATE - Presentation, discussion, and <br />possible action regarding the status of current drainage projects. [Ray Mayo, <br />Director of Public Works] <br />Mr. Appel said the Northside Project was substantially complete and would be walked <br />again with Hams County on June 12. Regarding the Bayside Terrace Project, there <br />was a preliminary walkwith the contractor and were meeting weekly and the City was <br />still coordinating with the residents. Chair Martin requested a copy of the project punch <br />list. Mr. Appel confirmed that missing street signs could be replaced promptly. <br />On the Brookglen Project, he said perhaps 98% of the waterline was finished, <br />connections were being made as the additional pipe was arriving. Mr. Appel said there <br />was one more junction box to put in. He said that for the City to have someone present <br />overnight for security would be about $86001week. Member Engelken said things did <br />seem to be going well and concerns had been addressed by staff. <br />7. ADDITIONAL DRAINAGE CONCERNS - Presentation, discussion, and possible <br />action to provide administrative staff of the City of La Porte with direction, if <br />necessary, regarding additional drainage concerns. [Ray Mayo, Director of <br />Public Works] <br />There were no additional concerns. <br />8. SET NEXT MEETING -The next meeting was set for July 14. <br />9. COMMITTEE COMMENT <br />The Committee thanked City stand Mr. Ratliff. <br />Martin adjourned the meeting at 5A2 p.m. <br />
The URL can be used to link to this page
Your browser does not support the video tag.