My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Drainage_and_Flooding_Report-dated_03-10-08
LaPorte
>
.Minutes
>
Drainage and Flooding Committee
>
Drainage and Flooding Reports
>
Drainage_and_Flooding_Report-dated_03-10-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:52:46 AM
Creation date
7/31/2025 11:19:14 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Reports and Studies
Date
3/10/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hydrologic and Hydraulic Study for Interconnect of HCFC Unit B 112-02-00 to Unit <br />B109-00-00 and HCFC Regional Detention Site Unit B512-01-00 <br />Prepared For: Harris County Flood Control District <br />Prepared By: Wilbus Smith Associates, Consulting Engineers and Planners <br />April 1997 <br />Seal Engineer: Melvin G. Spinks, P.E. <br />This is an analysis on Armand Bayou and its streams. A regional detention site addresses <br />the mitigation needs to offset and increase in flows due to the interconnection, the <br />proposed East Boulevard Roadway, and flood protection for the downstream residents in <br />the Brookglen Subdivision and the Spencer Highway estate subdivision. The sub - <br />watersheds are B 11202A, B 109A, and B 112B. The recommended ultimate plan <br />addressed (1) the detention storage for HCFC Regional Detention Site Unit B512-01-00 <br />to serve full development in sub -watershed B 11202A, (2) the full diversion of flows <br />along Tributary 1.78 — Willow Springs Bayou (Unit B 112-02-00) to Spring Gully (Unit <br />B 109-00-00) at the interconnect and (3) the channel improvements required along Unit <br />B 109-00-00 and Unit B 112-02-00 to serve the outflow from the proposed regional <br />detention facility. The channel improvements are concrete lined channel and widening. <br />A HEC 1 and HEC 2 analysis was done for this project. The detention pond will have <br />maximum available detention storage of 320 acre-feet at an elevation of 24.6 feet (1973 <br />NGVD adjustment). Base pond elevation is 15.5 (1973 NGVD adjustment). <br />Missing Information: Technical Appendices — Volumes 1 and 2 <br />Site visit shows that the interconnection was constructed and but has been closed <br />
The URL can be used to link to this page
Your browser does not support the video tag.