My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Drainage_and_Flooding_Report-dated_10_03_2008
LaPorte
>
.Minutes
>
Drainage and Flooding Committee
>
Drainage and Flooding Reports
>
Drainage_and_Flooding_Report-dated_10_03_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:54:06 AM
Creation date
7/31/2025 11:19:17 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Reports and Studies
Date
10/3/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sewers - replacement or new <br />36" pipe installation <br />$150 per If of installation <br />48" pipe installation <br />$210 per If of installation <br />60" pipe installation <br />$220 per If of installation <br />72" pipe installation <br />$330 per If of installation <br />Inlets <br />$2,000 per inlet <br />Concrete Pavement <br />$40 per square yard <br />Utility Relocation <br />$30 per If of relocation <br />Remove existing, placemenet, material <br />$80,607 <br />Roadway repair <br />$6,400 <br />Geotechnical (equivalent to 3 borings per culvert) <br />$4,645 <br />Total Cost <br />$11,525 <br />Estimated Unit Cost <br />$24.00 per It of culvert length per sq-ft of flow area per barrel <br />Other Unit Costs <br />Excavation <br />$20.00 per cy <br />Property Buy Outs <br />$135,000.00 per house <br />Concrete Flume <br />$40.00 per square yard <br />Environmental Improvements and Enhancements <br />Floatable trapping devicies for ponds or channels <br />Representative cost <br />$118,856 <br />Estimated Unit Cost <br />$119,000 for each pond <br />Extra sediment trapping for water quality - aboveground pond <br />Increase in storage volume - 10% <br />Estimated Unit Cost <br />$26,900 per ac-ft of <br />Extra sediment trapping for water quality - belowround pond <br />Increase in storage volume - 10% <br />Estimated Unit Cost <br />$126,000 per ac-ft of storaRe <br />Other Costs (as % ofconstruction cost) <br />Survey <br />5% <br />Typical Engineering and related costs <br />20% <br />Representative mobilization costs <br />5% <br />Klotz Associates <br />CiProjectty nvvvmenmmooenmuv <br />
The URL can be used to link to this page
Your browser does not support the video tag.